My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
35
>
2300 - Underground Storage Tank Program
>
PR0231320
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2022 4:36:01 PM
Creation date
8/25/2020 11:10:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231320
PE
2361
FACILITY_ID
FA0003602
FACILITY_NAME
TESORO (SPEEDWAY) 68151
STREET_NUMBER
35
Direction
N
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04318003
CURRENT_STATUS
01
SITE_LOCATION
35 N CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Recommended Practices for the Testing and Verification of Spill, Overfill, Leak Detection and Secondary Containment Equipment at UST Facilities <br /> 777777777 <br /> l • ftii <br /> PFaty Name: ENE Owner: <br /> Address: Address: <br /> Cityt State, Zip Code: City, . State, Zip Code: <br /> Facility I.D. #, Phone #: <br /> Testing Company: Phone #s Date: <br /> This procedure is to test the leak integrity of containment sumps. See PEI%RP1200 Section 6.5 for the test method. <br /> Containment Sump ID <br /> Containment Sump <br /> Material <br /> Liquid and debris <br /> removed from sump?* ❑ Yes ElNo 11 Yes 11No ❑ Yes ❑ No ❑ Yes ElNo ElYes 11No ❑ Yes ❑ No <br /> Visual Inspection (No <br /> cracks, loose parts ❑ pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fall ❑ Pass [] Fall ❑ Pass ❑ Fall ❑ Pass ❑ Fail <br /> or separation of the <br /> containment sump.) <br /> Containment Sump <br /> Depth <br /> Height From Bottom to <br /> Top of Highest <br /> Penetration <br /> Starting Water Level <br /> Test Start Time <br /> Ending Water Level <br /> Test End Time <br /> Test Period (Minimum <br /> test time: 1 hour) <br /> Water Level Change <br /> Pass/fail criteria: Must pass visual inspection. Water level drop of less than 1/8 inch. <br /> Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Comments: <br /> *All liquids and debris must be disposed of properly. <br /> Tester's Name (print) Tester's Signature <br /> pei . org <br />
The URL can be used to link to this page
Your browser does not support the video tag.