My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3081
>
2900 - Site Mitigation Program
>
PR0515030
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2020 11:28:21 AM
Creation date
9/3/2020 11:19:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0515030
PE
2950
FACILITY_ID
FA0012018
FACILITY_NAME
QUALITY CLEANERS
STREET_NUMBER
3081
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
3081 N TRACY BLVD
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.0 HAZARD MITIGATION <br /> 3.1 AIIt MONITORING <br /> General area air monitoring will be monitored for volatile organic compounds (VOCs) using a Microtip <br /> Photovac photoionization detector(PID)equipped with a 10.7 electron volt(eV)lamp. The instrument will <br /> be calibrated each day per the manufacturers instructions prior to the commencement of field activities,and <br /> a record will be kept of the calibrations and readings. The calibration log and air monitoring records log are <br /> to be kept on Table 1 - Air Monitoring Equipment Calibration Log and Table 2 -Air Monitoring Records <br /> Log,respectively. <br /> If VOC concentrations in the sustained for... then... <br /> breathin s ace ran e.. <br /> between 0 and 10 ppm any duration of time proceed with work monitoring as <br /> necessary. <br /> between 10 and 20 ppm for 1-5 minutes proceed with work monitoring every 5 <br /> minutes <br /> for over 5 minutes 1.take short break to allow vapors to <br /> desipate. <br /> 2. if situation allows,dampen soil with <br /> water. <br /> 3.don respirator. <br /> over 20 ppm for 1-5 minutes 1. proceed with work monitoring every 5 <br /> minutes. <br /> for over 5 minutes 2.try to reduce vapors as listed above,don <br /> respirator <br /> 3.don full-face respirator, if available. <br /> 4.measure benzene level with dreager <br /> pump, if available. <br /> 5.contact project manager. <br /> Ceres Associates Project CAS 19-2 <br /> Western Gravel Co.,Inc. 5 May 20, 1999 <br />
The URL can be used to link to this page
Your browser does not support the video tag.