Laserfiche WebLink
Nitrile gloves will be worn along with the latex outer glove during soil and water sampling to retard chemical <br /> migration to the skin. <br /> 3.3 SITE CONTROL MEASURES <br /> Site control measures are necessary to establish a work area, reduce the physical hazards, minimize the <br /> transfer of hazardous substances to and from the work area,and limit the access of un-authorized,untrained <br /> personnel. The following site control measures will be initiated on the job site: <br /> ■ The work area will be delineated by caution tape or other appropriate materials to create an exclusion <br /> zone. Only authorized personnel equipped with the proper protective equipment will be allowed into this <br /> zone. The size of the zone will be evaluated by the on-site health and safety officer based on his/her <br /> observations of the possible limits of the hazard. For example,the exclusion zone should be large enough <br /> to allow for drill rig mechanical malfunctions without injury to observer on the outside edge of the <br /> exclusion zone. <br /> ■ Uncontrolled migration of hazardous materials including soil and/or groundwater potentially containing <br /> hazardous materials is unacceptable. Soil and groundwater will be containerized in appropriate <br /> Department of Transportation(DOT)approved drums, bins or other approved containers. If necessary, <br /> a berm will be constructed to control the flow of potentially hazardous materials until they can be properly <br /> containerized. <br /> ■ Slip,trip and fall hazards will be minimized. The work area floor and ground will be kept free of excess <br /> material. If the ground or flooring is slippery,then measures to provide stable footing will be employed. <br /> ■ Consideration will be given to physical hazards such as being struck by, struck against,or being caught <br /> in,on or between site materials,structures,or machinery. Individuals will remain clear of moving machine <br /> parts unless their work requires them to be close to those parts. <br /> ■ Moving equipment or machinery will be required to have the necessary safety devices required by Cal- <br /> OSHA. <br /> ■ The ambient temperature will be monitored and the necessary controls implemented to reduce employee <br /> heat stress or chill. <br /> 3.4 ON-SITE HEALTH AND SAFETY BRIEFINGS <br /> Prior to the commencement of each day of field activities,job site personnel are required to attend a Site- <br /> Specific Health and Safety Meeting given by the Onsite Safety Coordinator. Items to be discussed include <br /> but are not limited to the following: <br /> Ceres Associates Project CA519-2 <br /> Western Gravel Co.,Inc. 8 May 20, 1999 <br />