My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Z
>
ZUCKERMAN
>
1181
>
2900 - Site Mitigation Program
>
PR0535015
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2020 1:00:47 PM
Creation date
9/11/2020 12:43:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0535015
PE
2960
FACILITY_ID
FA0020252
FACILITY_NAME
PG&E MCDONALD IS COMPRESSOR STATION
STREET_NUMBER
1181
STREET_NAME
ZUCKERMAN
STREET_TYPE
RD
City
TRACY
Zip
95234
APN
12908052
CURRENT_STATUS
01
SITE_LOCATION
1181 ZUCKERMAN RD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental <br /> 24March 2014 Resources <br /> Page 6 Management <br /> • Soil cuttings and decontamination water generated during the <br /> investigation will be containerized in sealed,labeled 55-gallon drums <br /> pending receipt of analytical laboratory results and proper disposal. <br /> • One equipment rinsate sample will be collected for each day of <br /> sampling. One trip blank will be included in each sample shipment <br /> to the laboratory. <br /> PERMITTING <br /> Appropriate regulatory agency boring permits will be obtained. Prior to <br /> beginning field activities, Underground Service Alert will be notified to <br /> ensure that no active underground utility lines in the area will be <br /> affected by the work. A private utility locator will also be used to <br /> determine whether underground utilities are present prior to <br /> commencing fieldwork. <br /> DATA REVIEW <br /> Upon receipt of the final laboratory data, ERM will review laboratory <br /> procedures and specific results to ensure data integrity. The review will <br /> include an analysis of spike and duplicate results, equipment calibration, <br /> and laboratory and field blank results. <br /> S UMIVIARY REPORT OF FINDINGS <br /> A draft report documenting field observations and laboratory analytical <br /> results will be submitted to PG&E for review and comment 30 days <br /> following receipt of analytical results. <br />
The URL can be used to link to this page
Your browser does not support the video tag.