My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Z
>
ZUCKERMAN
>
1181
>
2900 - Site Mitigation Program
>
PR0535015
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2020 1:00:47 PM
Creation date
9/11/2020 12:43:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0535015
PE
2960
FACILITY_ID
FA0020252
FACILITY_NAME
PG&E MCDONALD IS COMPRESSOR STATION
STREET_NUMBER
1181
STREET_NAME
ZUCKERMAN
STREET_TYPE
RD
City
TRACY
Zip
95234
APN
12908052
CURRENT_STATUS
01
SITE_LOCATION
1181 ZUCKERMAN RD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 6 <br /> package. <br /> I read through the well ordinance and noticed that in Section 10, Bentonite is required <br /> for backfilling borings. Our workplan called-out for the boreholes to be backfilled with <br /> soil cuttings. If this is not acceptable, let me know and we will be sure to make the <br /> change in the field. <br /> On the MFR, will you require a driver's license number and photocopy even though the <br /> site is owned by a corporation? Also assuming to leave the Property Owner Name <br /> section at the top of the form blank and PG&E in the Business Name section is <br /> sufficient. <br /> Last MFR question: the form is required to be signed by the person responsible for any <br /> SIC-EHD invoicing, i.e.-ARCADIS cannot sign as an agent for PG&E on the MRF. I <br /> imagine incorrect info on the MRF can be a headache on the back end of invoicing. Just <br /> want to make sure we get it correct for you. <br /> Once I get the MFR info, we should be able to submit the permit application early next <br /> week. Our tentative schedule for drilling is the April 22-23, but we will confirm with <br /> our inspector once the permits are issued. <br /> Mike, I do have a question you may be able to help me with. Following receipt of the <br /> soil and grab groundwater results, we plan to remobilize to the site to remove any <br /> impacted soils delineated during the investigation. I checked the EHD Site Mitigation <br /> web page and did not locate any info on excavation and grading permit requirements. <br /> Can you let me know if oversight of these activities are under a different San Joaquin <br /> County department. Any information on this is helpful. <br /> Thanks again. Please call or email if you have any questions regarding this site. <br /> -Jamey <br /> Jamey Peterson I Staff Geologist I jamey.peterson@arcadis-us.com <br /> ARCADIS U.S.. Inc. 1 140 Second Street Address, Suite 200 1 Petaluma, CA, 94952-7424 <br /> T. 707.776.0865 1 M. 707.480.3862 1 F. 707.776.0850 <br /> www.arcadis-us.com <br /> ARCADIS, Imagine the result <br /> Please consider the environment before printing this email. <br /> From: Mike Infurna [EH] [mailto:MInfurna@sjcehd.com] <br /> Sent: Friday, April 02, 2010 11:05 AM <br /> To: Peterson, Jamey <br /> Subject: RE: mcdonald island subsurface investigation - sjc permit application <br /> hello Jamey, <br /> Our Well Ordinance states "Work performed under the direct supervison of a <br /> Registered Civil Engineer, Registered (now Professional) Geologist, Registered <br /> Environmental Health Specialist, or Register Environmental Assessor, where the <br /> total depth is less than ten (10) feet, is not required to be performed by a C-57 <br /> licensed contractor". (Section 13.6.2) <br /> but a boring permit is required. <br /> If the site is already on our account base/active site list and there are no changes <br /> to the existing billing party, then only theep rmit application form and fee 89 per <br /> application/per parcel), a copy of the work plan, and a copy of the lead agency work <br /> 4/6/2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.