Laserfiche WebLink
28 October 2020 AdvancedGeo <br /> Project No. 20-6092 An Employee-Owned Company <br /> Page 12 of 20 <br /> ensures that the vendor understands the site layout, knows the protocol for entering the <br /> Facility and during transfer operations of the petroleum product. The Facility has the <br /> necessary equipment to respond to a discharge from the vehicle or fuel delivery hose. <br /> Unloading of tank trucks and fueling of vehicles takes place only in the designated <br /> unloading/fueling area and has the necessary equipment to respond to a discharge during <br /> loading and or unloading. <br /> The Coordinator or his/her designee supervises oil deliveries and shipments for all new <br /> suppliers and existing, approved suppliers. <br /> Vehicle filling operations are performed by Facility personnel trained in proper discharge <br /> prevention procedures. The truck driver or Facility personnel remain with the vehicle at <br /> all times while fuel is being transferred. Transfer operations are performed according to <br /> the minimum procedures outlined in Table 7. <br /> 4.9. BRITTLE FRACTURE EVALUATION - 40 CFR 112.7(1) <br /> There are no field-constructed ASTs at the facility, therefore this section does not apply. <br /> 4.10. CONFORMANCE WITH LOCAL REQUIREMENTS - 40 CFR 112.7(J) <br /> All applicable ASTs at this Facility are registered with the Local Applicable Requirements <br /> (LEA) and have current certificates of registration and special use permits required by the <br /> local fire code. <br /> 5.0. DISCHARGE PREVENTION — SPCC PROVISIONS FOR THE FACILITY <br /> The following measures are implemented to prevent unauthorized oil discharges and <br /> spills during the handling, and transfer of oil containers to and from delivery vehicles at <br /> the Facility. Oil-handling employees have received training in the proper implementation <br /> of these measures. <br /> 5.1. FACILITY DRAINAGE - 40 CFR 112.8(b) <br /> Storm water drainage from the Facility is designed to flow via surface drainage to the <br /> northwest and is directed to surface drain swales into storm drains along East Louise <br /> Avenue located to the north of the Facility. <br /> 5.2. BULK STORAGE CONTAINERS - 40 CFR 112.8 (c) <br /> Table 8 summarizes the construction, volume, and content of bulk storage containers at <br /> the Facility. <br />