My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
2050
>
2800 - Aboveground Petroleum Storage Program
>
PR0516363
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 10:48:28 AM
Creation date
9/22/2020 8:04:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0516363
PE
2832
FACILITY_ID
FA0010987
FACILITY_NAME
TEC Equipment
STREET_NUMBER
2050
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
Ave
City
Lathrop
Zip
95330
CURRENT_STATUS
01
SITE_LOCATION
2050 E Louise Ave
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
28 October 2020 AdvancedGeo <br /> Project No. 20-6092 An Employee-Owned Compony <br /> Page 14 of 20 <br /> 5.2.5. Partially Buried and Bunkered Storage Tanks - (40 CFR 112.8(c)(5)) <br /> This section is not applicable since there are no partially buried or bunkered storage tanks <br /> at this Facility. <br /> 5.2.6. Inspections and Tests - 40 CFR 112.8(c)(6) <br /> The scope and schedule of certified inspections and tests performed on the Facility's <br /> ASTs are specified in STI Standard SP-001. A 21-year inspection cycle for the double <br /> walled ASTs might be required. <br /> Records of certified tank inspections are kept at the Facility for at least three years, unless <br /> otherwise specified. Shell test comparison records are retained for the life of the tanks. <br /> Table 9 summarizes inspections and tests performed on ASTs. <br /> 5.2.7. Heating Coils - 40 CFR 112.8(c)(7) <br /> This section is not applicable since there are no ASTs equipped with heating coils at this <br /> Facility. <br /> 5.2.8. Overfill Prevention Systems - 40 CFR 112.8(c)(8) <br /> The two 6,000-gallon ASTs are equipped with an overfill prevention and alarm system to <br /> prevent overfilling the AST. The ASTs are equipped with a liquid level sensing device <br /> which is tested on a monthly basis during the monthly inspection, following manufacturer <br /> recommendations. Venting capacity is suitable for the fill and withdrawal rates. Facility <br /> personnel are present throughout the fuel loading operations to monitor the product level <br /> and the entire fuel loading operation. <br /> 5.2.9. Effluent Treatment Facilities - 40 CFR 112.8(c)(9) <br /> This section is not applicable since there are no effluent treatment systems at this Facility. <br /> 5.2.10. Visible Discharges - 40 CFR 112.8(c)(10) <br /> Visible discharges from any container or appurtenance — including seams, gaskets, <br /> piping, pumps, valves, rivets and bolts — are quickly corrected upon discovery. Oil is <br /> promptly removed from any spill areas and disposed of according to the waste disposal <br /> method described in Section 5.0. of this Plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.