approximately 200-foot buffer. All H. M. <br /> Holloway employees and any subcontractor doing <br /> work within the permit area will be informed of <br /> the project perimeter of the area surveyed. <br /> b) Prior to new ground disturbing activities outside <br /> of the proposed fenced area and for activities <br /> conducted within the additional marshalling and <br /> stockpiling area a pre-activity survey will be <br /> performed by a qualified biologist not more than <br /> 14 days prior (see Figure 3-7). If, during those <br /> surveys, resources that have been evaluated in this <br /> report are found, necessary and applicable <br /> measures will be implemented to avoid/minimize <br /> potential impacts. A copy of the pre-activity <br /> survey report, which includes delineation of <br /> survey areas and pertinent Project features, shall <br /> be submitted to the Planning Department prior to <br /> initiating new ground disturbing activities outside <br /> the fenced area, or within the marshalling and <br /> stockpiling area. If sensitive biological resources <br /> are identified that have not been evaluated, all <br /> activities will be temporarily stopped and <br /> California Department of Fish and Game (CDFG) <br /> and/or United States Fish and Wildlife Service <br /> (USFWS) will be consulted as appropriate to <br /> determine what additional measures may be <br /> required to avoid'impacts to such species. <br /> c) Annual surveys for potential nest sites in the <br /> permit area shall be conducted prior to nesting <br /> season (December/January). All banks will be <br /> evaluated for potential nesting opportunities, such <br /> as crevices or shelves. In the event that any <br /> nesting material is found, it will be promptly <br /> s <br /> Final Board of Supervisors 3/15/16 <br />