Laserfiche WebLink
UNDERGROUND STORAGE TANK MONITORING SYSTEM CERTIFICATION <br /> UST Monitoring Site Plan <br /> Site Address: Pilot Flying J -- 1513-+Thornton Rd, Lodi CA 95242 <br /> LEGE <br /> o=Dispenser <br /> P=Moridoring C90W Panel <br /> S=Sensor <br /> STP=Turbine Sump <br /> F=Ftll EucW <br /> V=Vapor Bucket <br /> A=AnWar Sensor <br /> IA=Aulomalit Tank Gage <br /> Ts=Transition Sump <br /> J L=Line Leak Deteelpr-- <br /> +� Product Lines=.. "'"'.. <br /> C� Awa Ven!Lines= — <br /> �r Vapot Lines= <br /> CAS=CleanAt Separator <br /> Vent Lines <br /> =Emergency Shut aSnitth <br /> .Z¢ ti� ceLr O=O.,emll Alarm <br /> Fian4*STPI-%-Turhmer sensor.,Lne <br /> +� Leak Deruor <br /> /'gip h Ts <br /> SJ 135 <br /> K <br /> 41 t4 <br /> A 4L <br /> , l <br /> los , <br /> Le Lio <br /> o <br /> �L7 L! <br /> Q L 2 <br /> e <br /> �L, <br /> T - F <br /> CES- ® .!!r• M1 <br /> x <br /> f <br /> +LF <br /> UTS'! n <br /> L,! <br /> tic <br /> I7 k17 <br /> I <br /> BUIWInq �' ; <br /> f <br /> L+! 9 17 0 I I, 2 LM <br /> 770 <br /> Tia <br /> O 111 i1' 0 '� I L L12 <br /> Date map was drawn: 5 / 1 2014 <br /> Instructions <br /> If you already have a diagram that shows all required information, you may include it, rather than this page,with your <br /> Monitoring System Certification. On your site plan, show the general layout of tanks and piping Clearly identify locations <br /> of the following equipment, if Installed: monitoring system control panels; sensors monitoring tank annular spaces, <br /> sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak <br /> detectors; and intank liquid level probes(if used for leak detection). In the space provided, note the date this Site Plan <br /> was prepared. <br /> Paae 5 of <br />