My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINNE
>
1728
>
2800 - Aboveground Petroleum Storage Program
>
PR0540694
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2021 8:48:08 AM
Creation date
11/18/2020 10:59:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0540694
PE
2832
FACILITY_ID
FA0009536
FACILITY_NAME
CONCRETE INC
STREET_NUMBER
1728
STREET_NAME
LINNE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25311027
CURRENT_STATUS
01
SITE_LOCATION
1728 LINNE RD
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 3B <br />TANK INTEGRITY TESTING PROGRAM <br />KRC TRACY PlANT <br />TankiD Integrity Tank Configuration Comments Details of Testing <br />Testing <br />Standard <br />10,000-STI Double walled steel • Exterior of containment • Conduct visual testing of <br />gallon SP001-05 tank, horizontal, shell is visible tank exterior per <br />diesel fuel cylindrical STI • Lack of manway EPNMarathon Oil <br />tank Fireguard prevents interior agreement <br />configuration. Tank inspection. <br />not in contact with the • Adequate vent relief <br />ground. Tank • Wall thickness1/4" <br />conforms to UL 2085 • Excellent protective <br />coating <br />• <br />500-gallon STI Double walled steel • Exterior of containment • Conduct visual testing of <br />diesel fuel SP001-05 tank, horizontal, shell is visible tank exterior per <br />tank cylindrical STI • Lack of manway EPNMarathon Oil <br />Fireguard prevents interior agreement <br />configuration. Tank inspection. <br />not in contact with the • Adequate vent relief <br />ground. Tank • Wall thickness1/4" <br />conforms to U L 2085 • Excellent protective <br />coating <br />• <br />• <br />• • <br />1@200 Single walled steel • PG&E Owned • Visual <br />gallon pad tank. Tank is not in <br />mounted. contact with the <br />transformer ground. <br />15.5 Internal Heating Coils-40 CFR 112.8 (c)(7) <br />The bulk storage tanks do not have internal heating coils. <br />1 CFR 11 <br />contractor <br />remains in t11e immediate the tank during fuel transfer <br />amount fuel delivered. The contractor can immediately rA•mc.nrl <br />situation by shutting down the truck's pumping equipment The receiving diesel fuel <br />tank does not include an automatic st1ut offdevice that impedes and stops fuel delivery as the <br />tank nears 95% of its listed capacity. <br />Product is delivered at a controlled rate and continuously monitored to prevent overfilling. <br />19
The URL can be used to link to this page
Your browser does not support the video tag.