My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DA VINCI
>
4627
>
2300 - Underground Storage Tank Program
>
PR0231074
>
INSTALL_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2021 2:36:18 PM
Creation date
12/7/2020 10:52:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2020
RECORD_ID
PR0231074
PE
2351
FACILITY_ID
FA0002541
FACILITY_NAME
7-ELEVEN INC #20632
STREET_NUMBER
4627
STREET_NAME
DA VINCI
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
11002003
CURRENT_STATUS
01
SITE_LOCATION
4627 DA VINCI DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SA N.J O A Q U I N Environmental Health Department <br /> COUNTY— <br /> 5. Contact Stacy Rivera, EHS, at (209) 468-3440 to arrange the following inspection appointments. <br /> All appointments must be scheduled 48 hours in advance. <br /> a) Inspection of tank vacuum gauge or inspection for brine leaks prior to tank placement in <br /> excavation. All tank pre-installation tests shall be performed according to tank manufacturer <br /> instructions. The tank installation checklist must be submitted to EHD prior to the final inspection. <br /> b) Verification of tank set, anchorage, appropriate backfill, and appropriate additional corrosion <br /> protection of tank anchors (turnbuckles, eye bolts, etc.). Additional corrosion protection is required <br /> on all exposed metal prior to covering. <br /> c) Primary tank test, according to manufacturer's specifications, prior to ballasting the tanks. <br /> d) Primary piping soap test of all piping and penetrations (product, vapor recovery, and vent): One- <br /> hour pneumatic pressure test at 110% of operating pressure, or 40 psi, whichever is greater, in <br /> accordance with manufacturer installation instructions. <br /> e) Verification of secondary piping slope at 1/8 inch per foot or greater, to a containment sump with <br /> an audible/visual alarm. <br /> f) Secondary piping soap test of all piping and penetrations (product, vapor recovery, and vent): <br /> One-hour pressure test at the manufacturer's recommended specification. <br /> g) Verification of all pipe setbacks, cross-overs, and burial depth according to the manufacturer's <br /> installation instructions and verification of appropriate piping backfill. <br /> h) Integrity testing of all sumps per the manufacturer's installation instructions, prior to backfill. <br /> i) Verification of brine type and witnessing of brine addition, prior to backfill. <br /> j) Verification of leak monitoring communication for all installed vacuum, pressure, or hydrostatic <br /> (VPH) components including piping, sumps, under dispenser containment sumps (UDCs), and all <br /> chase lines. Communication at end points of each vacuum zone and each vacuum monitored <br /> sump must be verified independently in operating condition. <br /> k) Verification of the dispenser footprints contained by the UDCs. Any potential leaks from piping <br /> and fuel filters must drain directly into UDCs. <br /> 1) Enhanced Leak Detection (ELD) testing, after facility is in operating condition. Appropriate test <br /> notification, tester certifications, and test method disclosure is required. Passing ELD test results <br /> must be received prior to receiving fuel. <br /> m) Verification of VPH components installation (shroud boots and band clamps for spill containers, <br /> appropriate rubber-type gasket or clamps on lids on all fill, vent and STP sumps, etc.). <br /> n) Verification of overfill prevention prior to first fuel delivery: Measurement of drop tubes to verify <br /> 95% tank volume shut off and/or verification that external audible/visual alarm activates when tank <br /> is 90%full. <br /> o) Spill bucket test, prior to first fuel delivery: Verify minimum 5-gallon capacity and pass a one hour <br /> hydrostatic test(or equivalent). Proper drainage method must be verified. <br /> p) Monitoring system functionality, prior to first fuel delivery: Functionality of the monitoring system <br /> must be verified to ensure it meets the requirements of California Code of Regulations (CCR) Title <br /> 23 and California Health & Safety Code (HSC) Chapter 6.7. <br /> q) Leak detector test, after first fuel delivery: Leak detector must be tested to confirm that the device <br /> can detect a leak of 3 gallons per hour at 10 psi. Leak detector monitored line volumes shall be <br /> appropriate for the make and model of the installed leak detectors, and shall be verified at the time <br /> of installation. <br /> r) Monitoring system functionality, after first fuel delivery, in operating condition: Functionality of the <br /> monitoring system must be verified to ensure it meets the requirements of CCR Title 23 and HSC <br /> Chapter 6.7. <br /> 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.