Laserfiche WebLink
Page 11 FE 382-063- 00 <br /> The southern section of lot 1 , the central portion of the <br /> site containing lot 2 , and the north section of lot 3 should be <br /> brought to an elevation of about 55 feet prior to receiving <br /> foundations . The northern portion of lot 1 is considered <br /> unsuitable for receiving normal foundations without incurring <br /> excessive cost. Detailed recommendations for the central and <br /> southern portion of the site containing the southern portion of <br /> lot 1 , lots 2 , 3 , 4 , A and B for foundations , site preparation , <br /> and other items are included in sections hereinafter . <br /> The portion of the project site contained in the southern <br /> portion of lot 1 and lots 2 , 3 , 4 , A and B is underlain by <br /> stratums of debris and lenses of organic matter . Due to the <br /> variability, location, and depths where debris and organic matter <br /> was encountered, we recommend that the foundations for entire <br /> building sites on lots 2 , 3 , 4 , A and B be designed in a <br /> conservative manner . <br /> Sp.Eeaj Foundations : After the areas to receive foundations <br /> have been brought to an elevation of approximately 55 feet, those <br /> lots , or portions of , identified as suitable for receiving <br /> foundations should be cleared of surface vegetation and debris . <br /> We recommend removing and replacing the near-surface material <br /> from below the building sites to a depth of approximately 6 to 8 <br /> feet . The objective is to locate and ensure removal of the lens <br /> of organic materials encountered in test pits 1 and 2 . The <br /> 'flic Foundafion Engineers, Inc. <br />