Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMPIUDC TEST <br /> Test Method Developed by ❑ Manufacturer R Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum R Hydrostatic <br /> Test Equipment Used: <br /> Sump/UDC ID 87-1 STP 87-2 STP 91 STP <br /> Sump Manufacturer <br /> Sump Depth (inches) <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 10:57 10:57 10:57 <br /> Initial Reading 2.3930 3.1317 3.8114 <br /> Test End Time 11:13 11:13 11:13 <br /> Final Reading 2.3938 3.1328 3.8119 <br /> Change in Reading 0.0008 0.0091 0.0005 <br /> Pass/Fail Criteria 0.002 0.002 0.002 <br /> Tightness Test Results R Pass ❑ Fail R Pass ❑ Fail R Pass ❑ Fail ❑ Pass ❑ Fail <br /> Sump/UDC ID 87-1 Fill 87-2 Fill 91 Fill <br /> Sump Manufacturer <br /> Sump Depth (inches) <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 9:44 9:44 9:44 <br /> Initial Reading 4.6709 2.8061 2.8603 <br /> Test End Time 10:00 10:00 10:00 <br /> Final Reading 4.6715 2.8058 2.8603 <br /> Change in Reading 0.0006 0.0003 0.0000 <br /> Pass/Fail Criteria 0.002 0.002 0.002 <br /> Tightness Test Results R Pass ❑ Fail R Pass ❑ Fail R Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3 of 5 <br />