Laserfiche WebLink
NP <br />3. <br />f <br />DISCUSSION: During placement of solid waste material, the <br />proposed increased quantities will not result in additional <br />overburden or compaction of soil over the original design for <br />the site. The increased quantities will simply cause the site <br />to reach its capacity sooner. Similarly, the topography will <br />not be altered. Final grades will remain as designed, but the <br />grades will be finalized sooner than originally anticipated. <br />MITIGATION MEASURES: No mitigation is necessary. <br />Yes No Maybe <br />AIR - Will the proposed project result in: <br />a. Substantial air emissions or deterior- <br />ation of ambient air quality? X <br />b. The creation of objectionable odors? X <br />C. Alteration of air movement, moisture, <br />or temperature, or any change in <br />climate? X <br />DISCUSSION: During placement of solid waste material, the <br />proposed project may result in objectionable odors. However, <br />since waste material will be covered on a daily basis, odors <br />should not affect adjacent off-site land uses. <br />MITIGATION MEASURES: Waste should be covered daily with 6t1 of <br />soil to prevent the escape of objectionable odors. <br />Yes No Maybe <br />WATER - Will the proposed project result in: <br />a. Changes in currents, or the course <br />of direction of water movements? X <br />b. Changes in the absorption rates, <br />drainage patterns, or the rate and <br />amount of surface runoff? X <br />C. Alterations to the course or flow <br />of flood waters? X <br />d. Change in the amount of surface <br />water in any water body? X <br />e. Discharge into surface waters, or in <br />any alteration of surface water <br />quality? X <br />2 <br />