My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2012-2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREWERT
>
916
>
4400 - Solid Waste Program
>
PR0526865
>
CORRESPONDENCE_2012-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2021 12:17:34 PM
Creation date
2/2/2021 2:56:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2012-2013
RECORD_ID
PR0526865
PE
4443
FACILITY_ID
FA0018195
FACILITY_NAME
CENTRAL VALLEY COMPOST
STREET_NUMBER
916
Direction
W
STREET_NAME
FREWERT
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19126022
CURRENT_STATUS
01
SITE_LOCATION
916 W FREWERT RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
d <br /> onto other properties and to prevent offsite sediment transport. Retention basins shall be fenced with <br /> six (6) foot high chain link fence or equal when the maximum design depth is 18 inches or more. <br /> Required retention basin capacity shall be calculated and submitted along with a drainage plan for <br /> review and approval prior to release of building permit (or Improvement Plan) (Development Title <br /> Section 9-1135) <br /> b) The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable <br /> at the time of building permit(or Improvement Plan) application. The fee will be based on the current <br /> schedule at the time of payment. The fee shall be automatically adjusted July 1 of each year by the <br /> Engineering Construction Cost Index as published by the Engineering News Record. (Resolutions R- <br /> 00-433) <br /> c) The Regional Transportation Impact Fee shall be required for this development. The fee is due and <br /> payable at the time of building permit(or Improvement Plan)application. The fee will be based on the <br /> current schedule at the time of payment. (Resolution R-06-38) <br /> d) A copy of the Final Site Plan shall be submitted prior to release of building permit (or Improvement <br /> Plan). <br /> e) Verification shall be obtained from Solid Waste Division (468-3066) that this development has met <br /> the requirements of the Waste Plan Format for Development Projects. Final Site Plan is required <br /> upon submittal of verification. <br /> f) Prepare and implement a Storm Water Pollution Prevention Plan (SWPPP) meeting the <br /> requirements of the State Water Resources Control Board (SWRCB) or provide documentation from <br /> the State indicating coverage is not required under the general construction permit. Applicant shall <br /> file a Notice of Intent (NOI) with the SWRCB and comply with the State "General Permit for Storm <br /> Water Discharges Associated with Construction Activity". The Waste Discharge Identification <br /> Number(WDID), issued by SWRCB, shall be submitted to Public Works for file. Permit Registration <br /> Documents (PRD) shall be filed with the SWRCB. A copy of the approved SWPPP and all required <br /> records, updates, test results and inspection reports shall be maintained on the construction site and <br /> be available for review upon request. <br /> g) The applicant shall comply with the State Water Resources Control Board General Order No. 97-03- <br /> DWQ, "General Permit for Discharges of Storm Water Associated with Industrial Activities Excluding <br /> Construction Activities" or provide documentation from the State indicating coverage is not required <br /> under the general industrial discharge permit. The WDID for the Industrial General Permit issued by <br /> SWRCB shall be submitted to Public Works for file. <br /> h) The driveway shall be designed/configured so that semi-truck and trailers enter and exit from/to <br /> Frewert Road without encroaching into the oncoming lane. <br /> i) An encroachment permit shall be required for all work within road right-of-way. (Note: Driveway <br /> encroachment permits are for flatwork only—all vertical features, including but not limited to <br /> fences, walls, private light standards, rocks, landscaping and cobbles are not allowed in the right- <br /> of-way.) (Development Title Sections 9-1145.4 and 9-1145.5) <br /> j) The driveway approach shall be improved in accordance with the requirements of San Joaquin <br /> County Improvement Standards Drawing No. R-17 prior to issuance of the occupancy permit. <br /> (Development Title Section 9-1145.5) <br /> Informational Notes: <br /> San Joaquin County PA-1200011/Valley Organics <br /> Community Development Page 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.