Laserfiche WebLink
18227.g Compostable Materials Handling Equipment <br />A description of compostable materials handling equipment used at the facility <br />including type, capacity, and number of units <br />The equipment that is used for the composting operation includes: one tractor, one windrow <br />compost turner, one grinder, one dump truck, one trommel screen, two loaders, a scale and a <br />water truck. The County will be notified of any significant equipment changes, and the facility <br />will adhere to any additional requirements at that time. The equipment used on site will, at all <br />times, be able to incorporate incoming material within 36 hours and meet all regulatory <br />requirements. <br />Maintenance of all equipment is based on recommendations from the individual <br />manufacturers. Scheduled maintenance is conducted by onsite personnel. No used oil or fluids <br />are stored on site. <br />18227.h Annual Operating Capacity <br />Anticipated annual operation capacity for the facility in cubic -yards <br />The annual operating capacity for the facility includes incoming material at 156,000 tons per <br />year. This is approximately 313,000 cubic yards. As the material composts it eventually <br />reduces to 50% of the volume. <br />18227.i Peak Loadings <br />A description of provisions to handle unusual peak loadings <br />The peak loading of the facility is 500 tons per day. When the material at the site approaches <br />this limit, additional inspectors will be assigned to trucks as they enter the facility. If necessary, <br />additional equipment will also be brought in from rental agencies or equipment dealers. <br />18227.j Storage and Disposal of Residues <br />A description of the proposed method for storage and final disposal of non- <br />recoverable or nonmarketable residues <br />The storage of material unable to be composted will be stored in covered roll -off containers <br />separated by material type (hazardous, non -hazardous trash, recyclables) and hauled to the <br />Forward Landfill on a weekly basis, or more often if the containers fill. <br />14 <br />