Laserfiche WebLink
n <br /> Installation Guide: Commercial AdvanTW Systems <br /> i <br /> ® pt �irsf8nuJ �,t" mrPc1y <br /> ...� �a...r k,�3,m � n,...® <br /> 7 <br /> MIMS <br /> Step 7a: Detach the Schedule 80 support pipes from the pack- <br /> aging material,and remove one of the two screws from each <br /> j pipe. Slide the support pipes through the holes in the support <br /> j ' brackets at the top of the vault. Reinstall the screws. <br /> Step 7b: Gently lower the vault into position in the access <br /> riser. The support pipes should rest on top of the tank(unless <br /> the vault was designed specifically to rest on the tank bottom). <br /> RN <br /> Step 7c: Insert the splice boxes into the access risers. To <br /> install a splice box,lubricate both the outside of the conduit <br /> - <br /> ' '.� .. coupling and the grommet with pipe lubricant or an equivalent <br /> product. Slide the coupling through the grommet until the box <br /> is pushed snug against the riser wall. (Splice boxes should be <br /> mounted inside the access risers unless specifically designed <br /> for external mounting. Internally mounted splice boxes are <br /> typicallys � grommetu�stad. <br /> Step7d Install the pup�pvaults by carefully <br /> lowering each pump and discharge assembly into the flow <br /> - inducer. <br /> IMPORTANT Do not use the pump cable to lower the pump! <br /> Step 7e: Using pipe lubricant or an equivalent product,lubricate <br /> the access riser grommet and the gray Schedule 80 nipple on <br /> the discharge assembly. Push the nipple through the grommet. <br /> IMPORTANT- Float positions are critical and should beset <br /> according to the engineering plans. Make sure the floats can <br /> move freely without interfering with each other and that they <br /> do not come in contact with the vault wall. <br /> r � <br /> ®2003 Orence Systems"Inc. NIM-ATX-AX-2 <br /> Rey 1A.2103 <br />{ <br />