Laserfiche WebLink
f <br /> n <br /> Installation Guide: Commercial AdvanTex® Systems <br /> a?s� a 34�•�_F,�itsSt t11 <br /> A qualified and licensed electrician should install and service t <br /> the panel and all ancillary wiring, in compliance with the `. <br /> National Electric Code as well as state and local codes. ' <br /> Complete wiring diagrams can be found in the panel's installa- <br /> tion manual and in the pouch on the inside of the control n•T '' <br /> panel's door. Wiring will include the following items: = @ <br /> • Incoming power to the panel. There may be one or more circuits <br /> required,depending upon the number of pumps and local codes. <br /> :9 <br /> • Wiring from the control panel to the recirculation pumps and floats. , <br /> • Wiring to the ventilation fan assembly. <br /> • Wiring to discharge pumps and floats(if applicable). <br /> • Phone wiring for modem connection. <br /> i NOTE: Control panels should be protected from direct sun- <br /> light. If possible, install the panel under a protective covering <br /> and mount it on weather-resistant material/supports. <br /> After you have installed the panel,verify proper connections <br /> and test the pumps and floats to make sure they are operating <br /> as indicated in the engineering plans and wiring diagrams. <br /> t p InsfaT! s it a�n ��l�O 1711, <br /> e.e., <br /> a €��[:isa�iig4E86�t&i,�F�;t�s ° <br /> .33.......,,.__a3....,,.,,$�af.3 ........:....d <br /> Step 9a: Place the distribution valve at the transport lines <br /> highest point, if possible.The distribution valve will not oper- <br /> ate properly if more than 2'of back pressure pushes against the <br /> sprang inside the valve. Set the distribution valve with the out- <br /> E <br /> r. <br /> let legs on the bottom. The distribution valve has 1-112" <br /> inlet/outlet holes, so bushings may be needed to adjust for <br /> proper transport line sizing. H <br /> NOTE: You might need to backfill the filtrate return line Inlet ball valve <br /> before installing distribution valves and transport lines. <br /> Step 9b: Install the distribution valve in the enclosure and <br /> connect the transport line from the pumps to the enclosure. <br /> Thoroughlyflush the the transport line of construction debris <br /> of construction debris <br /> beforeproceedin . Connect the transport lines from the pumps <br /> to the inlet side of the distribution valve. <br /> Step 9e: Verify proper cycling through the distribution valve <br /> by manually opening and closing the inlet ball valve. Check <br /> that no water is leaking at any of the plumbing joints. <br /> NOTE; Refer to the Orenco engineering document "OSI <br /> Automatic Distributing Valve Assemblies for Wastewater <br /> Effluent Systems"in your O&M manual for more information. <br /> NIM-ATX-AX-2 ®2003 Orenco Systems'Inc. <br /> Rev 1.0,7103 <br /> I3 <br /> E <br /> c <br />