Laserfiche WebLink
t <br /> r <br /> nsta I I ati o n G u i d e: Commercial Ad vanTW Systems <br /> 'd :_3;ia�i•..;mm 149 x t-'—i r€^t 3 :rr^^- € ¢ rw � <br /> t <br /> i <br /> Step 10a: Install the transport lines from the distribution <br /> valve to the AdvanTex pods. Flush all debris from the <br /> r <br /> transport lines before making connections to the AdvanTex <br /> p2ds�• <br /> i <br /> Step 10b: Connect the transport lines to the inlet of each <br /> AX 100 pod through the gate valve assembly. <br /> NOTE: If no distribution valve is required, connect the <br /> transport line from the pump discharge to the inlet side of the <br /> s <br /> AXI 00 pod.Again,flush all lines before making the final <br /> connection. <br /> s <br /> Step Ila: Using 3"pipe, plumb the air ventilation line to the <br /> 3" fitting that protrudes through the filter wall(on the end of <br /> the pod opposite the outlet coupling). <br /> Step llb: After you have installed the last AdvanTex pod on <br /> multipod systems, install the air inlet. The air inlet may be <br /> painted if another color is desired. <br /> H <br /> NOTE: Single pod systems may use individual passive vents <br /> instead of a forced ventilation system. Refer to the engineering <br /> plans for requirements. <br /> a�. <br /> 14 <br /> ®2003 Orenco Systems*Inc. NIM-ATX-AX-2 <br /> Rev 1.0,2/03 <br />