My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2021 4:48:00 PM
Creation date
2/22/2021 2:00:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> X <br /> Photo G Photo H <br /> c d <br /> Photo I Photo J Photo K <br /> Use Oil and gasoline compatible PTFE tape on the following steps. <br /> ❑ Get the 1/2" galvanized union and thread a 1/2" galvanized close nipple into each end. <br /> ❑ Separate the union and install the end that does not have the nut on it into the inlet of <br /> the vacuum pump. To the other end of the union, assemble the 1/2" galvanized elbow <br /> and then a 1/2" x 2-1/2" galvanized nipple into the elbow, see photo I. <br /> ❑ To the nipple above, thread on the 1/2" ball valve so that when the handle is in the open <br /> position it faces you. Completely tighten the ball valve to be about 30° below horizontal <br /> to the right, see photo I. <br /> ❑ To the valve, install a 1/2" close nipple then the 1/2" x 1/4" x 1/2" reducing tee and <br /> completely tighten with the branch of the tee facing to the right when looking from the <br /> union end, see photo I. <br /> ❑ Install the 1/4" pipe plug into the reducing tee and completely tighten. <br /> ❑ Install and completely tighten the 1/2" NPT x 5/8" flare elbow into the tee with the flare <br /> facing up, opposite the union fitting, see photo J. <br /> 8-7 <br /> CARR Approved IOM 8-Wayne Vista Series-Executive Orders VR-201 and VR-202 <br />
The URL can be used to link to this page
Your browser does not support the video tag.