My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2021 4:48:00 PM
Creation date
2/22/2021 2:00:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Installation Smart Sensor Interface Module <br /> Smart Sensor Interface Module <br /> The Smart Sensor Interface Module 8 input or 7 input w/embedded pressure versions monitor Vapor Flow Meter <br /> (VFM) and Vapor Pressure Sensor (VPS) inputs. <br /> Switch off power to the TLS console while you install modules and connect sensor wiring. <br /> Open the right door of the console and slide the necessary Smart Sensor modules into empty I.S. Bay slots. <br /> Connect the field wiring from each of the sensors following instructions in the Vapor Flow Meter and Vapor <br /> Pressure Sensor manuals. Setup the Smart Sensor module(s) following instructions in this manual. <br /> NVMEM Board <br /> Verify that a NVMEM board is installed in the TLS console (ref. Figure 2-14 in the V-R TLS-3XX Series Consoles <br /> Troubleshooting Manual P/N 576013-818, Rev J or later).This board contains flash EEPROM and RAM needed <br /> to run ISD software and store ISD reports. No setup is required. <br /> Site Shut Down Requirements <br /> Normal ISD operation requires TLS console control of the STP in each of the gasoline tanks. If the site has <br /> Wireless Pressure Line Leak Detection (WPLLD), Pressure Line Leak Detection (PLLD) or Volumetric Line Leak <br /> Detection (VLLD) for each tank,you can use the line leak disable setup to control the vapor recovery tanks (diesel <br /> tanks do not require shutdown). If the site does not have line leak detection for all vapor recovery tanks,you can <br /> use output relay setup to control each tank. In lieu of line leak detection, install the necessary modules (output <br /> relay) to control each gasoline tank. .Alternately,you can install Dispenser Relay Modules to control dispensing. <br /> Dispenser Interface Module (DIM) <br /> Verify that a dispenser interface module (DIM) is installed in the TLS console communication bay (ref. Figure 2) <br /> and that it is designed to communicate with the type of gasoline dispensers installed at the site. The ISD software <br /> requires dispenser fuel flow meter data inputs. Reference TLS-350R Point-of-Sale (POS) Application Guide to <br /> select correct DIM card. Refer to the manual shipped with the DIM for installation instructions, refer to the TLS- <br /> 3XX System Setup manual to program the DIM. <br /> Probe Interface Module <br /> Verify that a Probe Interface Module(s) is installed (Intrinsically-Safe bay) and that a Mag probe is in each gasoline <br /> tank and is connected to the module(s). Program the Mag probes following instructions in the TLS-3XX System <br /> Setup manual. <br /> IB-8 <br /> CARB Approved IBM 10 -Veeder Root ISO Install,Setup,9 Operation Manual-Executive Order VR-202 <br />
The URL can be used to link to this page
Your browser does not support the video tag.