My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2021 4:48:00 PM
Creation date
2/22/2021 2:00:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Clearing Alarms <br /> Vapor Flow and Vapor Pressure alarms can be cleared by running the respective manual test or by waiting until the next <br /> assessment period has passed. <br /> Clearing Vapor Collection (A/L)Alarms <br /> Once a certified technician has fixed the cause of the vapor flow problem, the alarm can be cleared by two methods: <br /> running a manual test or letting the fueling point go through a full day of transactions. The manual A/L test is much faster <br /> and will allow the technician to clear the alarm before leaving the site. To run a manual test, go to VRWControl then <br /> select "Manual A/L Test". Now select the fueling point(s)that are in alarm and on the next dispense, if there is an A/L <br /> passes then the alarm will clear. See Figure 8a &8b. <br /> Figure 8a & 8b <br /> CYRM]/Control _ M IYRM)/Contral(ManaalA/L7est) r <br /> P <br /> IA2.6 AP 2.6 <br /> Manual Calibrate ManualA/L 4 1,6 07/31107 L 6 02109/0? <br /> Inl�griky Test 8er}sar Q9B A/L #.00 Test 19:20 16:50 <br /> A/L <br /> •- <br /> Clear L 26 021115108 L 26 07108108 <br /> M anitorin 18;10 20:53 <br /> A/L 0,93 A/L ' 0,82 <br /> -- 4 <br /> lall <br /> W42/09 08/12/09 <br /> Note: The manual A/L test should be done on either a known non-ORVR vehicle or test container that will return air/vapor <br /> mixture back to the UST. If the A/L does not meet the required threshold then the fueling point will remain in alarm. <br /> Clearing Pressure Related Alarms <br /> A technician will also have two methods of clearing pressure related alarms by either letting the system go through its <br /> normal assessment period or manually clearing pressure alarms. <br /> To clear a Pressure Related Alarms, do the following: <br /> 1. Go to the VRWControl Page and select "Clear Monitoring". <br /> 2. Enter in your Franklin Fueling Systems technician ID number. <br /> 3. Enter in the administrator password. <br /> 4. All the Pressure Monitoring Alarms shall clear. <br /> II-24 <br /> CANB Approved IOM 11-INCON Vapor Recovery Monitoring(VRM)-Executive Order VR-202 <br />
The URL can be used to link to this page
Your browser does not support the video tag.