My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRINITY
>
10858
>
2300 - Underground Storage Tank Program
>
PR0526212
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2021 1:58:42 PM
Creation date
2/25/2021 4:42:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0526212
PE
2351
FACILITY_ID
FA0017737
FACILITY_NAME
CHEVRON STATION #307709*
STREET_NUMBER
10858
STREET_NAME
TRINITY
STREET_TYPE
PKWY
City
STOCKTON
Zip
95219
APN
06602015
CURRENT_STATUS
01
SITE_LOCATION
10858 TRINITY PKWY
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TESTABLE PROCEDURE ONLY,FOR STANDARD f%>( - STEP 3T: DETERaMINE CABLE LENGTH <br /> ELS,PROCEED TO NEXT PAGE, faun cable along upper tube a rid over the top plate on <br /> the fiM bradi*t as shnwn. With the focal in tate down <br /> STU 11, INSTALL SMKU ADAPTOR ASSY position(as shown In Figure 3T)align JDop in cable w)th <br /> Put Cable thru threads in inlet tube and outthru cable rivet and top hole in float bracket. Use the rivet as a <br /> port on side of inlet tube. Thread the socket adaptor template to sane the loop in the cable and pull cable <br /> assernbly finger tight tntu the inlet tube. Now, the ca- tight and crimp female w" crimping tocol/pliers onto <br /> ble porton the inlet tube must be in line with the'ffnat cable at this location. Tr1m excess cable with wire cut- <br /> as shown previously in Figure 8A. ter 1 sassors, For reference,from the seam where the <br /> upper tube and valve any meet to the end of the table <br /> Socket after trimming will require approximarety 3S'of cabie. <br /> aptor <br /> assembly mbly Cable over float bracket <br /> Cable Seam 1 L_ <br /> port <br /> figure 3T <br /> STEP 4T: ATTACH CABLE TO FLOAT BRAOMT <br /> FWm IT Ensure table is over the haat bracket, Usk-,g the sup- <br /> plied rivet align loop in cable wf#h top hole in fluat <br /> ST'eeP 2Tt PASS GABLE THRU FERRULE bracket and pass river thru rable loop and float bracket <br /> Pass cable thru ferrule- Loop cable and then pass cable hole. Using rivet tui for IIB'dia rnarKli el attach rivet <br /> bark ihnu ferrvie. Keep ferrule loose until cable length and cable to the float bracket. See Ian page for list of <br /> is delftmintd in the next step. Note If cable aid frays replacement cable parls. <br /> it may be necessary to trim the cable again topass thru <br /> ferfuie. ,,1 Attach rivet to tap hole <br /> to"mandrel <br /> a river <br /> Ferm* <br /> Trim — STEP M ENSURE PROPER CAaU OPERATION <br /> "bk �r Unthread the sockar adapbor assembly from the inlet <br /> ,hcr ` _ tutzeand en, Iry float ar►d <br /> poppet tr+ave{reer'!when <br /> Strp3T Loop \ usrk,eiadapwr assembly is pulled cut. It should only <br /> cequire 3'to 4"uf nvvement in order to actuate the <br /> FfgumZj floatand poppet. Thread sodcetadaptorassemblyfin- <br /> ger tight into inlet tube after testing- <br /> 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.