Laserfiche WebLink
�Ji , Department of Public Works <br /> SAN <br /> AQUIN <br /> ""O 3 Kris Balaji,Director of Public Works <br /> C0UNTv j.. <br /> Fritz Buchman,ieputyDirectorDe✓e!epment <br /> •- <br /> WC&Mg fnr YOU David Tolliver,Deputy. ncte:rCnerehons <br /> NateeZarif,Deputy Directcr'Enginceeng <br /> November 16,2021 Kristi Rhea,Business Administrator <br /> MEMORANDUM <br /> TO: Community Development Department <br /> CONTACT PERSON:Giuseppe Sanfilippo <br /> FROM: Alex Chetley, Engineering Services Manager <br /> Development Services Division <br /> SUBJECT: PA-2100061 (ZR)&-062(SU);A Zone Reclassification and Vested Major Subdivision <br /> application.The Zone Reclassification proposes to rezone two(2)parcels totaling 19.3- <br /> acres from Agricultural Urban Reserve—20-acre minimum(AU-20)to Low Density <br /> Residential(R-L).The General Plan designation is Low Density Residential(R/L).The <br /> underlying project is a Major Subdivision to subdivide the two(2)parcels totaling 19.3- <br /> acres into ninety-six(96)residential lots;located on the east side of South Pock Lane, <br /> 2,076 feet south of East Eighth Street, Stockton.(Supervisorial District 1) <br /> OWNER:Yolanda Sanchez APPLICANT:Pock Lane Partners, LLC_ <br /> ADDRESS: 2706 South Pock Lane,Stockton APN: 179-120-13&-14 <br /> INFORMATION: <br /> The site is not currently located within a Federal Emergency Management Agency Designated Flood <br /> Hazard Area. <br /> The site is within the Phase 2 area of the National Pollutant Discharge Elimination System(NPDES). <br /> Pock Lane has an existing and planned right-of-way width of 50 feet. <br /> Loomis Road has an existing and planned right-of-way width of 60 feet. <br /> The Traffic Impact Mitigation Fee will be required when parcels are developed. The fee is due and <br /> payable at the time of building permit application. <br /> The Regional Transportation Impact Fee will be required when parcels are developed_The fee is due <br /> and payable at the time of building permit application. <br /> The Water Supply Facilities Impact Mitigation Fee will be required when parcels are developed. The <br /> fee is due and payable atthe time of building permit application <br /> 1810 East Hazelton Avenue I Stockton,California 95205 T 209 468 3000 1 F 209 468 2999 <br /> in Follow us on Facebook(it;PublicWorksSJC Visit our website: :wvvw.s1gov.org/pubvvorks <br /> PA-2100031, 32, 61, 62 (ZR, SU) Response Letters 31 <br />