My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2008 (7/08 TO 12/08)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
CORRESPONDENCE_2008 (7/08 TO 12/08)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2021 2:39:24 PM
Creation date
4/20/2021 1:14:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2008 (7/08 TO 12/08)
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Construction Quality Assurance A)Plan Extension of Closure Cap <br /> Corral Hollow Sanitary Landfill August 21,2008 <br /> ♦ Observe that rade control con ru i <br /> gst ct on staking is performed prior to <br /> work and that the grades are in accordance with the construction <br /> drawings. <br /> ♦ Observe that angular or sharp rocks, rocks greater than 0.5-inch in <br /> diameter, and other debris that could damage the overlying geosynthetic <br /> materials are removed from the surface of the subgrade. Verify that the <br /> subgrade is free of irregularities and is steel drum rolled smooth prior to <br /> the placement of any geosynthetic material. <br /> ♦ Observe that the final surface provides continuous and intimate contact <br /> with the overlying geosynthetics. <br /> ♦ Observe that any soft or yielding areas of the subgrade are adequately <br /> excavated and replaced in accordance with the specifications. <br /> ♦ Coordinate with the Contractor to perform subgrade verification surveys <br /> upon completion of the subgrade preparation. Observe corrective action <br /> measures as determined by the verification surveys. Verification surveys <br /> will also be used to determine the limits of the subgrade preparation for <br /> measurement and payment applications. <br /> 3.4.4 Vegetative Layer <br /> ♦ Observe that the material source is suitable for the vegetative cover and <br /> is free of particles greater than 2-inches in diameter. <br /> ♦ Observe that grade control construction staking is performed before work. <br /> ♦ Perform sieve analysis (ASTM D422) to observe that materials are in <br /> compliance with requirements of the technical specifications. Perform <br /> tests at testing frequencies specified in Table 3-2. <br /> ♦ Observe that the vegetative cover is placed in one uniform lift and that <br /> placement operations do not damage underlying geosynthetic <br /> installations and piping system installations. <br /> ♦ Coordinate with the Contractor to perform cover thickness verification <br /> surveys upon completion of placement operations. Observe corrective <br /> action measures as determined by the verification surveys. Verification <br /> surveys will also be used to determine the limits of the vegetative layer <br /> for measurement and payment applications. <br /> Vector Engineering, Inc. .143E Spring Hill Drive*Grass Valley, CA• 530 272-2448 <br /> P 9 Y ( ) <br /> -20- <br />
The URL can be used to link to this page
Your browser does not support the video tag.