Laserfiche WebLink
PA-2100059 (11P) Airpark 599 -2- <br /> As an interim measure until such time as the City of Stockton's traffic signal project is completed <br /> and accepted, the following interim improvements/measures shall be constructedlimplemented: <br /> a) Improvements to direct all truck traffic related to this project to the B Street and Arch- <br /> Airport Road intersection as well as limiting passenger vehicle traffic to right in/right out at the <br /> intersection of Arch-Airport Road and Giannecchini Lane and the intersection of Arch-Airport <br /> Road and Pock Lane are required; or, <br /> b) A temporary roadway connection to existing Qantas Lane designed to accommodate <br /> truck traffic to/from the project. The connection shall be located at an approved distance from <br /> the intersection of Qantas Lane and Arch-Airport Road to allow safe turning movements and <br /> provide acceptable vehicle queue lengths. Improvement plans and specifications prepared by a <br /> registered civil engineer shall be submitted for review and must be approved by San Joaquin <br /> County Department of Public Works. <br /> Note: Any improvements within City of Stockton right-of-way shall be submitted for review and <br /> must be approved by the City of Stockton. <br /> 9) Prior to issuance of the occupancy permit; a traffic signal shall be constructed at the Arch-Airport <br /> Road and Giannecchini Lane intersection, Improvement plans and specifications prepared by a <br /> registered civil engineer shall be submitted for review and must be approved by the City of <br /> Stockton and the San Joaquin County Department of Public Works. <br /> As an interim measure until such time as the City of Stockton's traffic signal project is completed <br /> and accepted, the following interim improvements/measures shall be constructed/implemented: <br /> a) Improvements to direct all truck traffic related to this project to the B Street and Arch- <br /> Airport Road intersection as well as limiting passenger vehicle traffic to right in/right out at the <br /> intersection of Arch-Airport Road and Giannecchini Lane and the intersection of Arch-Airport <br /> Road and Pock Lane are required; or, <br /> b] A temporary roadway connection to existing Qantas Lane designed to accommodate <br /> truck traffic to/from the project. The connection shall be located at an approved distance from <br /> the intersection of Qantas Lane and Arch-Airport Road to allow safe turning movements and <br /> provide acceptable vehicle queue lengths, lrnprovement pians and specifications prepared by a <br /> registered civil engineer shall be submitted for review and must be approved by San Joaquin <br /> County Department of Public Works. <br /> Note: Any improvements within City of Stockton right-of-way shall be submitted for review and <br /> must be approved by the City of Stockton. <br /> '10) Prior to issuance of the occupancy permit. the applicant shall pay for necessary traffic signal <br /> timing upgrades at locations on Arch-Airport Road which shall be coordinated with the City of <br /> Stockton. <br /> 1 1] Prior to issuance of the occupancy permit, the following utilities are required to be constructed in <br /> conformance with the City of Stockton improvement standards: <br />