My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014102
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ARCH
>
2750
>
2600 - Land Use Program
>
PA-2100059
>
SU0014102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2022 8:15:37 AM
Creation date
5/3/2021 4:42:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014102
PE
2635
FACILITY_NAME
PA-2100059
STREET_NUMBER
2750
Direction
E
STREET_NAME
ARCH
STREET_TYPE
RD
City
STOCKTON
APN
17726010, -14
ENTERED_DATE
4/27/2021 12:00:00 AM
SITE_LOCATION
2750 E ARCH RD
RECEIVED_DATE
4/26/2021 12:00:00 AM
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PA-2100059 (11P) Airpark 599 -2- <br /> As an interim measure until such time as the City of Stockton's traffic signal project is completed <br /> and accepted, the following interim improvements/measures shall be constructedlimplemented: <br /> a) Improvements to direct all truck traffic related to this project to the B Street and Arch- <br /> Airport Road intersection as well as limiting passenger vehicle traffic to right in/right out at the <br /> intersection of Arch-Airport Road and Giannecchini Lane and the intersection of Arch-Airport <br /> Road and Pock Lane are required; or, <br /> b) A temporary roadway connection to existing Qantas Lane designed to accommodate <br /> truck traffic to/from the project. The connection shall be located at an approved distance from <br /> the intersection of Qantas Lane and Arch-Airport Road to allow safe turning movements and <br /> provide acceptable vehicle queue lengths. Improvement plans and specifications prepared by a <br /> registered civil engineer shall be submitted for review and must be approved by San Joaquin <br /> County Department of Public Works. <br /> Note: Any improvements within City of Stockton right-of-way shall be submitted for review and <br /> must be approved by the City of Stockton. <br /> 9) Prior to issuance of the occupancy permit; a traffic signal shall be constructed at the Arch-Airport <br /> Road and Giannecchini Lane intersection, Improvement plans and specifications prepared by a <br /> registered civil engineer shall be submitted for review and must be approved by the City of <br /> Stockton and the San Joaquin County Department of Public Works. <br /> As an interim measure until such time as the City of Stockton's traffic signal project is completed <br /> and accepted, the following interim improvements/measures shall be constructed/implemented: <br /> a) Improvements to direct all truck traffic related to this project to the B Street and Arch- <br /> Airport Road intersection as well as limiting passenger vehicle traffic to right in/right out at the <br /> intersection of Arch-Airport Road and Giannecchini Lane and the intersection of Arch-Airport <br /> Road and Pock Lane are required; or, <br /> b] A temporary roadway connection to existing Qantas Lane designed to accommodate <br /> truck traffic to/from the project. The connection shall be located at an approved distance from <br /> the intersection of Qantas Lane and Arch-Airport Road to allow safe turning movements and <br /> provide acceptable vehicle queue lengths, lrnprovement pians and specifications prepared by a <br /> registered civil engineer shall be submitted for review and must be approved by San Joaquin <br /> County Department of Public Works. <br /> Note: Any improvements within City of Stockton right-of-way shall be submitted for review and <br /> must be approved by the City of Stockton. <br /> '10) Prior to issuance of the occupancy permit. the applicant shall pay for necessary traffic signal <br /> timing upgrades at locations on Arch-Airport Road which shall be coordinated with the City of <br /> Stockton. <br /> 1 1] Prior to issuance of the occupancy permit, the following utilities are required to be constructed in <br /> conformance with the City of Stockton improvement standards: <br />
The URL can be used to link to this page
Your browser does not support the video tag.