My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2115
>
2900 - Site Mitigation Program
>
PR0518818
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2021 2:28:51 PM
Creation date
5/4/2021 2:05:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0518818
PE
2960
FACILITY_ID
FA0014164
FACILITY_NAME
UNITED STORAGE
STREET_NUMBER
2115
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503002
CURRENT_STATUS
02
SITE_LOCATION
2115 W WASHINGTON ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S Grnclwat.ar 91693197 P -135 <br />Maailming Well (MW-6) Dccomminioning Work Flail <br />PM As Produas, Lim pornmi. <br />2115 West WaahiAgton &met <br />to decommission the well from the RWQCB, a well destruction permit must be obtained from the <br />San Joaquin County Environmental Health Department. A billing a_ccount must be established with <br />the County, and fees must be prepaid. Equipment and supplies must be ordered and procured. <br />3-2 Overboring, Casing RetnovalAnd Grouting <br />A truck-mounted, 8-inch, hollow-stem auger, fitted with a one-inch (diameter) pilot shaft, will be <br />used to drill-out, of pull-out, the well casing and screen. The over-boring will be advanced slowly <br />to allow complete destruction and removal of the PVC-casing fragments. Water for drilling and <br />decontamination of equipment is available at the site. llentonite/cement grout will be placed in <br />the open boring with a tremmie pipe to insure that grout is effectively placed within the saturated <br />zone. Approximately one cubic-yard of cement/bentonite slurry will be used. Cuttings from the <br />monitoring well boring may contain traces of product. A high-pressure washer will be used to clean <br />the augers, drilling tools, and field equipment. <br />33 Site CleanuP <br />Upon completion of the work, construction debris and excess soil will be removed from the site. <br />Non-hazardous auger cuttings, rinsate, and excess grout will be placed in 55-gallon drums and <br />staged at the site fol. disposal. PM Ag Products will be responsible for non-hazardous waste <br />disposal_ <br />3.4 Reports and Correspondence <br />A brief report of results will be prepared upon completion of the fieldwork. <br />2
The URL can be used to link to this page
Your browser does not support the video tag.