My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2115
>
2900 - Site Mitigation Program
>
PR0518818
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2021 2:28:51 PM
Creation date
5/4/2021 2:05:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0518818
PE
2960
FACILITY_ID
FA0014164
FACILITY_NAME
UNITED STORAGE
STREET_NUMBER
2115
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503002
CURRENT_STATUS
02
SITE_LOCATION
2115 W WASHINGTON ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Name, Country, Operating <br />Company: <br />Total Site Area (m2), <br />Freehold/leasehold/other: <br />Stockton, California, USA Date of Construction: 1938 <br />United Storage <br />8,900 IT? <br />Freehold <br />Site Ref. No.: 31 <br />Page 7 of 10 <br />Total Tanks Present & 32 <br />Storage Volume (m3): 27,871 tn3 <br />ISSUES FINDINGS IMPLICATION / CORRECTIVE <br />ACTION <br />included in the San Joaquin County Hazardous Materials Management Plan. <br />Tank inspections No formal tank inspections performed. <br />Other significant site operations Steam is generated by two natural gas powered, 100 horsepower boilers and is used to heat <br />the ASTs. Old boiler remains pressurized, but is not in service. <br />Two air compressors serve the site. The compressors are housed in dilapidated buildings. <br />The plan is for relocating the compressors to the old boiler building after the boiler is <br />removed. <br />None <br />Site access, site boundaries From West Washington Street immediately to the south. A dirt access road connects to <br />West Washington Street to the main office. The dirt access road is owned by the Port of <br />Stockton. <br />Site boundaries are delineated by chain-link fencing and rail lines. <br />None <br />Description of Structures Main building features offices and warehouse — metal clad <br />Two boiler buildings — metal clad <br />Two compressor buildings — metal clad <br />Suspension building (used for product mixing) — metal clad <br />None <br />Ground Cover Concrete and compacted dirt in vicinity of ASTs. Surface drains in concrete areas <br />lead to sanitary sewer vault in southern end of property. There are no storm water <br />drains which lead to Stockton Deep Water Channel or any other body of water on <br />the property. <br />Driveway is compacted dirt. <br />Concrete berm used for secondary containment for ASTs storing chemicals, acids, <br />and finished products. <br />No evidence of significant staining from chemicals or other substances. <br />None <br />Air Emissions This facility holds a Permit to Operate from the San Joaquin Valley Unified Air <br />Pollution Control District (expiration date 1 August 2002). <br />Sources of air emissions include the boiler and tank vents. <br />None <br />Water Discharges The site is supplied by the City of Stockton. <br />Wastewater is generated from surface run-off and boiler blow-down. <br />Wastewater collects in a containment vault prior to discharge to the City of <br />None <br />MGM CIER'GHTY81 LLER INI1ER\lAllal6L,INC 916703113.doc
The URL can be used to link to this page
Your browser does not support the video tag.