My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014090
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
RIVER
>
27865
>
2600 - Land Use Program
>
PA-0200370
>
SU0014090
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2021 2:51:53 PM
Creation date
5/12/2021 2:18:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014090
PE
2656
FACILITY_NAME
PA-0200370
STREET_NUMBER
27865
Direction
E
STREET_NAME
RIVER
STREET_TYPE
RD
City
ESCALON
Zip
95320-
APN
24723009
ENTERED_DATE
4/22/2021 12:00:00 AM
SITE_LOCATION
27865 E RIVER RD
RECEIVED_DATE
6/24/2021 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(2) Provide an approved potable water supply for all employees. <br />(3) Provide approved toilets for all employees (chemical toilets are acceptable). <br />(4) Provide hand washing facilities on or near the approved toilets. (Development Title Section 9- <br />1415.3[i]) <br />i. SETBACKS: No excavation shall take place within twenty-five (25) feet of any property line or right- <br />of-way (nor within the allowed slopes adjacent to said twenty-five (25) foot setback), unless the <br />elevation prior to excavation is more than that of the abutting property, in which case the elevation <br />within said twenty-five (25) foot setback shall at no time be less than that of the abutting property, at <br />the property line. (Development Title Section 9-1415.3[j]) <br />(1) Temporary Cut Slopes at Setback Lines. Temporary cut slopes (i.e., for limited periods of time, <br />slopes that are in the process of extraction prior to being backfilled) at setback lines shall not <br />exceed one (1) foot horizontal to one (1) foot vertical, except that temporary cut slopes at setback <br />lines to a maximum of one half (1/2) of a foot horizontal to one (1) foot vertical may be maintained <br />if site-specific geologic and engineering analysis demonstrate through a slope stability analysis <br />that the proposed temporary cut slopes will have a minimum slope stability factor of safety as <br />required in Section 9-1415.3(k)(4). However, in the event that there are existing structures on the <br />adjacent property (or the immediate potential for structures on the adjacent property), the <br />excavation shall at no time be closer to the property line than a line projected on a slope of one (1) <br />to one (1) from the property line to the toe of slope. <br />(2) Final Slopes. Final cut and/or fill slopes shall not exceed two (2) feet horizontal to one (1) foot <br />vertical. <br />(3) Fill Slopes. Fill slopes shall be constructed consistent with recommendations from a qualified <br />civil/geotechnical engineer based upon site-specific geologic conditions; <br />FENCING: Fencing four (4) feet in height consisting of not less than three (3) strands of barbed wire, <br />or an approved equivalent, shall be placed around the excavation area where slopes steeper than two <br />(2) feet horizontal to one (1) foot vertical are maintained. Six (6) foot high security fencing or an <br />approved equivalent shall be required where slopes steeper than two (2) feet horizontal to one (1) foot <br />vertical are created, if the proximity of such slopes to residential uses or other uses involving a <br />concentration of people so warrants. (Development Title Section 9-1415.3[1]) <br />k. SCREENING AND LANDSCAPING: Screening consistent with Chapter 9-1020 is required. <br />(Development Title Section 9-1415.3[m]) <br />(1) The landscaped area shall be ten (10) feet wide. Adequate setback for maintenance shall be <br />required, and sight distance at road intersections shall not be impaired. A row of crop trees satisfies <br />this requirement. <br />EXCAVATION/RECLAMATION SCHEDULE: The reclamation plan shall show the phases of <br />excavation. Reclamation on one phase of an excavation shall be initiated prior to the start of the next <br />excavation phase. The final reclamation of any phase of excavation shall be completed within two <br />years of the commencement of the reclamation process. Excavation shall be limited so that at any <br />point of time a maximum of one phase is being reclaimed while one phase is being excavated. <br />(Development Title Section 9-1415.3[0]) <br />m. TIME LIMITATION: The Quarry Excavation Permit shall remain in effect as long as the excavation <br />continues in compliance with the approved Permit. (Development Title Section 9-1415.3[p]) <br />04-P-hase-4-excavat+ee-shal�-be-completed try -2-087-2-04S; and-r-eElamatiee-shat-be-ees4Weted-by <br />2009. <br />PA -0200370 - Conditions of Approval <br />
The URL can be used to link to this page
Your browser does not support the video tag.