My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014090
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
RIVER
>
27865
>
2600 - Land Use Program
>
PA-0200370
>
SU0014090
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2021 2:51:53 PM
Creation date
5/12/2021 2:18:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014090
PE
2656
FACILITY_NAME
PA-0200370
STREET_NUMBER
27865
Direction
E
STREET_NAME
RIVER
STREET_TYPE
RD
City
ESCALON
Zip
95320-
APN
24723009
ENTERED_DATE
4/22/2021 12:00:00 AM
SITE_LOCATION
27865 E RIVER RD
RECEIVED_DATE
6/24/2021 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A—Rhase4exEavatiee-sha lJ be-eompleted-by-2009 matien shaWbe-eomMeted-b)�-4-4: <br />(-3)—Rhase-lfl-exoavatiee shall, be-eorspleted-by 2-0813,-arm restamatieR l-be-sorapleted-by 2Q4&. <br />(1) The Quarry Excavation Permit shall expire 40 years from the original date of approval, with final <br />reclamation to be completed by December 31, 2044. <br />ANNUAL INSPECTION REPORTS: Annual inspections of the excavation shall be conducted by the <br />County to ensure compliance with the conditions of the permit and the reclamation plan. The County <br />may use professional services as provided for in Section 9-240.11. The consultant shall be selected <br />by San Joaquin County. Upon completion of the annual inspection, the person in charge of the mining <br />operation shall submit to the State Geologist and the County a report which shall contain all the <br />information as required by Section 2207 of the Public Resources Code. The cost of the inspection shall <br />be paid by the mine operator. Additional inspections may be conducted, but the cost of additional <br />inspections shall be paid for by the mine operator only if non-compliance with the conditions of the <br />Quarry Excavation Permit or the reclamation plan is found. (Development Title Section 9-1415.3[q]) <br />o. PERFORMANCE GUARANTEE: In order to ensure reclamation of the site, compliance with <br />conditions of approval, and compliance with County and State mining regulations, the applicant shall <br />provide performance guarantees as a condition of the issuance of the Quarry Excavation Permit. The <br />amount and form of the guarantee shall be subject to annual review and approval by the County and <br />the State, and the amount shall be adequate to ensure reclamation of disturbed land and/or land to be <br />disturbed during a given phase. The annual review of the financial guarantee shall be coordinated with <br />the annual inspection and approval of successive reclamation security so that the guarantee includes <br />the amount of disturbed land plus the amount of land estimated to be disturbed during the next 12 <br />months, less the amount of land previously determined by the Development Services Division's annual <br />inspection to have been reclaimed. The performance guarantee shall be in the form of either (1) a <br />surety bond, (2) a trust fund with the lead agency, or (3) an irrevocable letter of credit. Any interest <br />accrued in a trust fund shall stay with the trust fund account. The financial guarantee shall be payable <br />to "San Joaquin County" or the "Department of Conservation" under the applicable provisions of the <br />County and the State mining regulations. The financial guarantee shall be callable by the County or <br />the State under the following circumstances: <br />(1) The applicant causes the excavation to become idle (as defined in Section 9-110 of the <br />Development Title) without an approved interim management plan; <br />(2) The applicant files for bankruptcy; <br />(3) The County or State determines on the basis of annual inspections and reports that the applicant <br />has not maintained substantial compliance with the approved Permit; <br />(4) There arises an occurrence or circumstance which, in the opinion of the County or State, <br />jeopardizes the site reclamation; or <br />(5) The State makes one or more of the findings specified in Section 2774.4(a) of the State Public <br />Resources Code. <br />(6) In any instance that the County or State makes the demand for partial or full tender of the financial <br />guarantee of performance, the County and/or State may use all or any portion of the financial <br />guarantee to reclaim the site and to recover its administrative costs associated therewith. <br />(Development Title Section 9-1415.3[r]) <br />p. ENFORCEMENT: Except as otherwise provided in State Mining Regulations, the County shall have <br />authority to enforce provisions of the Surface Mining and Reclamation Act. The County may exercise <br />all enforcement regulations available under the County Development Title and the State Public <br />PA -0200370 — Conditions of Approval <br />
The URL can be used to link to this page
Your browser does not support the video tag.