My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
18846
>
3000 – Underground Injection Control Program
>
PR0546051
>
COMPLIANCE INFO_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:26 PM
Creation date
5/19/2021 9:59:48 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3000 – Underground Injection Control Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 1
RECORD_ID
PR0546051
PE
3030
FACILITY_ID
FA0003883
FACILITY_NAME
VICTOR FINE FOODS
STREET_NUMBER
18846
Direction
N
STREET_NAME
STATE ROUTE 99
City
LODI
Zip
95240
APN
01709051
CURRENT_STATUS
02
SITE_LOCATION
18846 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VFF DEEP INJECTION WELL NO. 1 <br /> Logging & Testing Operations <br /> Page 2 <br /> Length <br /> 11 20 ' jts of 1/4" (nom) sch 40 T&C pipe <br /> with 23/32" OD couplings 220 ' <br /> 9 21' jts of 1/4" (nom) sch 40 T&C pipe <br /> with 27/32" OD couplings 189 ' <br /> Total 409 ' <br /> No further attempt to run bubble pipe. Made up hanger flange as <br /> described above. Hooked up generator and 500 ' of 5" discharge <br /> hose. Hose was routed over top of clarifier tank. <br /> Started pumping at about 1800 hours, then shut down after a few <br /> minutes to fix leaks. Restarted at 1845 hours. Well produced <br /> muddy water until about 2015 hours, then produced clear water <br /> with minor amounts of sand. Sand production diminished to near <br /> zero at end of pumping period. HLA representative took water <br /> samples and made field readings of pH , temperature and electrical <br /> conductivity. Continued to pump well at rates of 100-200 gpm <br /> through midnight. <br /> 3/31/90 Production Test <br /> Continued pumping well to clarifier tank at average rate of 184 <br /> gpm. HLA representative took water samples, made field readings <br /> and prepared samples for analysis. Shut down pump at 0145 hours <br /> when tank was full . Total volume of water produced = 63 , 364 <br /> gallons , or approximately nine wellbore volumes . Shut pump <br /> discharge valve. About 15 minutes after shutting down , the well <br /> began producing a small flow of gas and water through the elec- <br /> trical cable port in the pump hanger flange . Packed off tempo- <br /> rarily around the pump cable , then cut the cable and plugged the <br /> port. The well died in about 10 minutes. Off location at 0300 <br /> hours. <br /> Wilson Pump Company crew AOL at 0800 and RU to pull test pump. <br /> Pulled test pump and rolled up discharge hose. Installed injec- <br /> tion tree . Wilson crew off location at 1500 hours. <br /> 3/31/90 Injection Test and Logging <br /> Halliburton Services AOL at 1100 hours and RU pump truck and <br /> cartridge filter unit to filter and inject water from clarifier <br /> tank. Filter unit consists of two housings, each with nineteen <br /> 30- inch , 3-micron cotton wound elements. Halliburton began <br /> pumping at 1402 hours, injecting 204 gpm at zero WHP. <br />
The URL can be used to link to this page
Your browser does not support the video tag.