My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014092
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
POCK
>
2706
>
2600 - Land Use Program
>
PA-2100061
>
SU0014092
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2022 9:51:56 AM
Creation date
5/25/2021 7:58:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014092
PE
2666
FACILITY_NAME
PA-2100061
STREET_NUMBER
2706
Direction
S
STREET_NAME
POCK
STREET_TYPE
LN
City
STOCKTON
Zip
95205-
APN
17912013, -11, -14
ENTERED_DATE
4/22/2021 12:00:00 AM
SITE_LOCATION
2706 S POCK LN
RECEIVED_DATE
7/6/2022 12:00:00 AM
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\lsauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1822
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SR-99 Frontage Road. The posted speed limit is 25 mph on both portions of <br /> Loomis Road, and parking is permitted where there is adequate shoulder width. <br /> Loomis Road provides direct access to both 2706 Pock Lane and the northern <br /> portion of 3009 Pock Lane. <br /> State Route 99 (SR-99) is a six lane, north-south freeway east of the project site. <br /> SR-99 is a key regional highway that extends from Sacramento in the north to the <br /> Grapevine south of Bakersfield, connecting major cities in the Central Valley. In <br /> the project vicinity,the posted speed limit is 65 miles per hour(mph). <br /> Dr. Martin Luther King Jr. Boulevard/Charter Way is a principal east-west <br /> arterial north of the project site, connecting SR-99 and Interstate 5. Within the <br /> project vicinity, this roadway is generally four lanes wide, with a posted speed <br /> limit of 45 mph. <br /> Mariposa Road is a two- to four-lane, generally northwest-southeast arterial north <br /> and east of the project site. In the project vicinity, the San Joaquin County <br /> General Plan designates Mariposa Road as a principal arterial between Dr. Martin <br /> Luther King Jr. Boulevard and SR-99, and a minor arterial east of SR-99. The <br /> posted speed limit on Mariposa Road is 45 mph northwest of 8th <br /> Street/Farmington Road and 50 mph southeast of 8th Street/Farmington Road. <br /> 8th Street is a two lane, east-west major collector north of the project site. It <br /> extends from Airport Way to the west to Mariposa Road to the east, where it <br /> changes designation to Farmington Road. The posted speed limit on 8th Street is <br /> 35 mph, and on-street parking is permitted along much of its length. <br /> Farmington Road is a generally two-lane, east-west arterial northeast of the <br /> project site. It extends east of Mariposa Road and is designated as SR-4 east of <br /> Golden Gate Avenue. There is no speed limit posted on Farmington Road. <br /> B Street is two lane, north-south major collector west of the project site. It <br /> extends from Dr. Martin Luther King Jr. Boulevard in the north to just south of <br /> Arch Airport Road. The posted speed limit is 35 mph north of 4th Street and south <br /> of Ralph Avenue (within the City of Stockton), and 25 mph between 4th Street <br /> and Ralph Avenue (within unincorporated San Joaquin County), and on-street <br /> parking is permitted along much of its length. <br /> Carpenter Road is a two-lane, east-west minor collector south of the project site. <br /> It extends from Airport Way in the west to SR-99 Frontage Road. The posted <br /> speed limit is 25 mph. In the immediate project vicinity, there is insufficient <br /> shoulder width to permit parking. <br /> Togninali Lane is a two-lane, east-west minor collector south of the project site. <br /> It connects Pock Lane to SR-99 Frontage Road. The posted speed limit is 25 mph, <br /> and parking is generally permitted. <br /> Pock Lane Public Review Draft IS/MND 3-62 May 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.