Laserfiche WebLink
4.04 PIPING <br /> A. Measurement <br /> 1. 3" Main Lateral <br /> Measurement for 3" main lateral shall be per linear foot from the <br /> header to the wye. <br /> 2. 2" and 3" Lateral Combination <br /> Measurement for 3" and 2" lateral combo shall be per linear foot from <br /> the valve box to the well head. <br /> B. Payment <br /> Payment for piping shall be per the unit price per liner foot quoted in the <br /> cost sheet. Payment shall be full compensation for labor, materials, <br /> equipment used for trenching, placing sand bedding, installing laterals, <br /> backfilling and compacting lateral trenches, repairing soil berms where the <br /> lateral crosses, and doing all other work as shown on the construction <br /> drawings and as specified here-in. <br /> 4.05 HEADER CONNECTION <br /> A. Measurement <br /> Measurement for header connection shall be per the number installed. <br /> B. Payment <br /> Payment for header connection shall be by the unit price quoted in the cost <br /> sheet. The unit price quoted shall include full compensation for furnishing <br /> all labor, tools, equipment for connecting each well lateral to the existing <br /> header as shown on the construction drawings and specified here-in. <br /> 4.06 VALVE BOX <br /> A. Measurement <br /> Measurement for valve box installation shall be per the number installed. <br /> B. Payment <br /> Construction Specifications San Joaquin County <br /> Dual LFG Extraction Wells Public Works Department <br /> Harney Lane Sanitary Landfill Page 11 of 13 Solid Waste Division <br /> Revised 11-18-09 <br />