My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2008-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
CORRESPONDENCE_2008-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2021 11:39:55 AM
Creation date
5/25/2021 11:23:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2008-2009
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
290
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.04 PIPING <br /> A. Measurement <br /> 1. 3" Main Lateral <br /> Measurement for 3" main lateral shall be per linear foot from the <br /> header to the wye. <br /> 2. 2" and 3" Lateral Combination <br /> Measurement for 3" and 2" lateral combo shall be per linear foot from <br /> the valve box to the well head. <br /> B. Payment <br /> Payment for piping shall be per the unit price per liner foot quoted in the <br /> cost sheet. Payment shall be full compensation for labor, materials, <br /> equipment used for trenching, placing sand bedding, installing laterals, <br /> backfilling and compacting lateral trenches, repairing soil berms where the <br /> lateral crosses, and doing all other work as shown on the construction <br /> drawings and as specified here-in. <br /> 4.05 HEADER CONNECTION <br /> A. Measurement <br /> Measurement for header connection shall be per the number installed. <br /> B. Payment <br /> Payment for header connection shall be by the unit price quoted in the cost <br /> sheet. The unit price quoted shall include full compensation for furnishing <br /> all labor, tools, equipment for connecting each well lateral to the existing <br /> header as shown on the construction drawings and specified here-in. <br /> 4.06 VALVE BOX <br /> A. Measurement <br /> Measurement for valve box installation shall be per the number installed. <br /> B. Payment <br /> Construction Specifications San Joaquin County <br /> Dual LFG Extraction Wells Public Works Department <br /> Harney Lane Sanitary Landfill Page 11 of 13 Solid Waste Division <br /> Revised 11-18-09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.