Laserfiche WebLink
Construction Monitoring <br />Construction activities shall be monitored in the landfill and mitigation area to ensure - <br />that protected wetlands are avoided, sediment barriers are effective, and is designed top disruption <br />of <br />wetlands is minimized. The construction monitoring program _ <br />wetlands and other habitats against disturbance and to monitor construction activities - <br />associated with implementation of the mitigation plan. <br />Monitoring of Landfill Construction <br />The biological monitor shall monitor landfill construction <br />orusen five biological resources <br />necessary to prevent adverse impacts on wetlands and other <br />identified in the mitigation plan. The biological monitoreasaelaeo o be rk avo ded the andtto gev ew <br />ineer <br />and construction foreman onsite to determine which <br />the construction schedule. No wetlands or other biological resources identified in the plan <br />shall be disturbed without approval by the biological monitor. <br />Monitoring of Mitigation Area Construction <br />All activities associated with construction of wetlands prescribe <br />tdru tioin n actit igation <br />plan shall be monitored continually by the biological mo <br />itor. No the mitigation area shall be permitted without the l biological monitor The biological monitor <br />biological monitor determines that his/her presencerequired.grading specifications <br />shall consult the project enoi achieve eer t he intconstended ection xults. The an as tbiologic l monitor shall <br />within the mitigation area t <br />document the grading activities and report to the County. <br />Postconstruction Performance Standards and Remedial Actions <br />The goal of the mitigation plan is to achieve no net loss of wetlands area or <br />ecological value in the project area. To that endmitigation plan <br />spome1 s creating <br />t <br />wetlands at ratios greater than 1:1 for each habitattype <br />lures in <br />wetlands creation. The performance standards are achieving therefore no netgned to allow loss of wetland. for <br />If <br />measured amount of mitigation failure while stillg <br />performance standards are not met, then remedial actions shall be prescribed by the <br />biological monitor. The prescribed remedial action(s) shall be completed in a timely <br />manner by the County or its agent. <br />50 <br />