Laserfiche WebLink
PC: 6-1-89 <br />GP-89-8/UP-89-2 <br />jected to have a useful life of 36 years, whereupon the total <br />site will ♦ - rehabilitated to agriculture. <br />Contamination of groundwater supplies could occur from leachate <br />generated in the landfill. This potential problem is proposed <br />moni- <br />toring program with test w-lls, under the purvue of - Central <br />Valley Regional- Quality Control• • Other control <br />measures proposed include diverting surface storm water flows, <br />covering wastes daily, and collecting and directly pumping <br />raiTwater• of fill areas. <br />Stormwater Drainage r Adjacent Properties: <br />The project proposes t• divert the course of South• • - - <br />northerly of its existing location as it passes through the <br />project site. This r- • • • • not affect •i . - pro- <br />perties, <br />• <br />• - - but Conditionsof • • • have been proposed • <br />ensure compliance. A perimeter • 1 -r collection ditch and <br />detention pond - also been proposed • control runoff. <br />Rubbish and Litter Alon Harney Lane: <br />Litter will be controlled by installing temporary fences down- <br />wind of the working face of each landfill segment. A permanent <br />fence will be constructed on the perimeter of the site. Litter <br />along Harney Lane will be controlled by periodic cleaning and by <br />enforcing the existing County policy that requires tarps to be <br />placed over open loads. <br />Use of Foothill Sanitary Landfill Site: <br />The sanitary landfill site on Harney Lane is designed to pro- <br />vide the solid waste disposal needs of the City of Lodi and the <br />remainder of the north Countyarea. Use of the Foothill <br />Sanitary Landfill site on Waverly Road was not recommended <br />because of the higher cost of hauling north County refuse to <br />the Waverly Road site. Economic analysis prepared for the EIR <br />indicates that, over the life of the project (36 years), it <br />would cost $49.9 million more to utilize the Foothill site than <br />the Harney Lane site. <br />ENVIRONMENTAL <br />.. <br />A Draft EIR was prepared on the project and circulated for public <br />review • comment.- Planning Commission • r • _ • r <br />lic <br />-13- <br />