Laserfiche WebLink
`t <br />PV 6-1-89 <br />GP®89-8/UP-89--2 <br />hearing on the Draft EIR;on December 15, 1988. Following the <br />Draft period, Jones r Stokes Associates,as the <br />County's EIR consultant, prepared responses to comments and <br />published the Final EIR. Following a second public hearing on <br />April 1989, Planning Commission certified _ Final EIR as <br />adequate. No unavoidable, significant, adverse impacts were <br />identified in the EIR; therefore, a Statement of Overriding <br />Considerations is not required. Appropriate mitigation measures <br />in _ EIR havebeen recommended by the Planning Division as <br />Conditions of Approval. <br />.7 <br />0 <br />