My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARRISON
>
641
>
2200 - Hazardous Waste Program
>
PR0514497
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2022 2:40:34 PM
Creation date
6/22/2021 3:53:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0514497
PE
2228
FACILITY_ID
FA0011023
FACILITY_NAME
Ross Roberts Truck Repair Inc
STREET_NUMBER
641
Direction
S
STREET_NAME
HARRISON
STREET_TYPE
St
City
Stockton
Zip
95203
CURRENT_STATUS
01
SITE_LOCATION
641 S Harrison St
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ross Robert Truck Repair Used Oil Tank <br /> Interim Assessment and Conditional Certification <br /> September 14, 2021 <br /> impact by the containment walls. The tank is not anchored. The tank rests on a concrete pad and is not <br /> in contact with soil. If failure of the tank was to occur, it could be seen by the operators. <br /> The tank is coated to provide corrosion protection. Some areas of the metal coating on the tank top and <br /> along the top of the tank sides is worn off. However, the tank is located indoors, is not in contact with <br /> soil and subject to minimal external corrosion. <br /> The tank is equipped with a Graco Husky 1050 air operated diaphragm pump. Portable containers will <br /> be brought to the tank area where the pump and a one-inch hose will be used to suction out the container <br /> into the tank. There is small air line to the diaphragm pump. There is no other piping on the tank. <br /> There is a Hazardous Waste Accumulation Sticker on the tank. There is no accumulation start date <br /> entered on the sticker. <br /> There is an unused pump at the west end of the tank and two uncapped ports on the east side of the <br /> tank top. One of these uncapped ports is used when emptying the tank. <br /> Venting <br /> The primary tank has an emergency vent but no atmospheric vent. The secondary tank has an <br /> atmospheric vent installed but no emergency vent. A five-inch port on the secondary tank is capped off. <br /> Piping <br /> There is a one-inch flexible hose from the diaphragm pump on the tank top to a portable container. <br /> Secondary containment of the flexible hose is provided by the concrete containment area. Piping from <br /> the tank is visually monitored for leaks. <br /> Monitoring <br /> The tank fluid level is monitored by manually sticking the tank. The tank's secondary containment is <br /> also monitored by manually sticking the tank. <br /> 5.0 Field Checklist <br /> A field checklist was used by Trident Environmental and Engineering, Inc. personnel during the site <br /> inspection. The inspection on July 20, 2021 was conducted by Nancy Rebholtz, STI Certified AST <br /> Inspector. The project was overseen by Michael Heckathorn, P.E. (#45775, California), STI Certified <br /> AST Inspector, AST-6710. The checklist is included on the following pages. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.