My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014171
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HENDERSON
>
18500
>
2600 - Land Use Program
>
PA-1000267
>
SU0014171
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2021 10:54:25 AM
Creation date
6/24/2021 1:31:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014171
PE
2611
FACILITY_NAME
PA-1000267
STREET_NUMBER
18500
Direction
S
STREET_NAME
HENDERSON
STREET_TYPE
RD
City
MOUNTAIN HOUSE
Zip
95391-
APN
20917003, 25804001
ENTERED_DATE
5/21/2021 12:00:00 AM
SITE_LOCATION
18500 S Henderson RD
RECEIVED_DATE
5/20/2021 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
deposit with the MHCSD, funds equivalent to the cost of the widening as listed in the TIF Report. The <br /> MHCSD General Manager may use the funds to improve other regional roads as determined by a <br /> traffic study and stated in the TIF technical report and approved by the MHCSD. If Grant Line Road <br /> in Alameda is not widened, an interim design showing the transition from 4 lane to two lane within the <br /> boundary of Mountain House shall be submitted to the MHCSD for review and approval. <br /> 45. Prior to the issuance of the first residential building permit north of Byron Road, one of the three <br /> permanent Byron Road crossings shall be constructed. Prior to the issuance of the 13001h residential <br /> building permit north of Byron Road, the second permanent Byron Road crossing and the Railroad <br /> crossing shall be constructed. Prior to the issuance of the 27001h residential building permit north of <br /> Byron Road, the third permanent Byron Road and the second at grade railroad crossing shall be <br /> constructed. If at any time, frequent, regularly scheduled train service is established on the Union <br /> Pacific Line along Byron Road, no further Final Subdivision Maps will be approved until the Central <br /> Parkway overpass is complete and operational. <br /> 46. All street improvements along Byron Road from East boundary of the MHCSD to the west boundary <br /> of the MHCSD shall be constructed to its full and final design as indicated on the Master Plan and the <br /> latest MHCSD standards. Timing shall be consistent with Community Approvals as determined by <br /> MHCSD. <br /> 47. All streets within the development and as shown on the Tentative Map shall be improved by the <br /> developer according to the following: <br /> 48. If the property shown on the Tentative Map is to be developed in phases, then a Subdivision <br /> Agreement and appropriate bonding shall be executed between the MHCSD and the developer for <br /> each phase, prior to the approval of the Final Map. <br /> 49. If the land covered by the Tentative Map is to be developed in phases, then the boundary of each <br /> phase shall be determined by the following access requirements: <br /> A. Two points of access shall be provided by streets having a classification of residential collector <br /> or higher. <br /> B. If a phase boundary is to parallel the alignment of an in-tract street, then the boundary shall <br /> be along the rear line of the lots facing the street. Boundary lines along the centerline or edge <br /> of a right-of-way line of a street shall not be allowed, except when specifically approved in <br /> writing by the General Manager of the MHCSD. <br /> C. Prior to the beginning of the final design of the subdivision,the Applicant and the Public Works <br /> Director shall consult with Tracy Fire regarding emergency access to the proposed <br /> development. Any requirements for emergency access shall be approved by MHCSD. <br /> 50. Except where allowed otherwise by the MHCSD,the grading of the project shall be suchthat all storm <br /> water runoff shall drain to public streets, public alleys, Mountain House Creek, or drainage facilities <br /> within easements for storm drainage purposes. Runoff across property lines to adjacent private <br /> property (not including alleys that have storm drainage facilities maintained by the MHCSD or a <br /> homeowner's association) will not be allowed. <br /> 51. The minimum arterial improvements, outside of the tentative map boundaries, as described herein, <br /> shall be constructed as necessary to serve the proposed development or phases of development, as <br /> determined by MHCSD. <br /> 52. All buildings shall be wired per specifications in the "Low Voltage Construction Pre-wire Guidelines" <br /> and other specifications provided by the MHCSD, and in accordance with the latest version of the <br /> MHCSD Technology Master Plan. <br /> PA-1000267—Conditions of Approval 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.