Laserfiche WebLink
General Requirements-40 CFR Part 112.7 <br /> Requirements for SPCC Plans-40 CFR Part 112.7 <br /> Conformance with 40 CFR Part 112.7- 112.7(a)(1) <br /> This facility is in conformance with the SPCC Regulations which become effective November <br /> 10,2011 with the exception of the items listed in the Proposed Schedule of Modifications for <br /> at the front of this Plan. The list includes the items that the Professional Engineer determined <br /> should be modified to achieve conformance with the regulation requirements. <br /> Deviations from 40 CFR 112.7- 112.7(a)(2) <br /> In complying with all applicable requirements of the SPCC Regulation, no deviations were <br /> employed or claimed in this Plan. <br /> Facility Description-112.7(a)(3) <br /> Oil Type and Storage Capacity- 112.7 (a)(3)(i) <br /> A list of the types of oil and storage capacity is included in Table 1. See Figure 2 behind the <br /> Figures tab for the location of the storage tanks,oil storage areas,transformers,oil/water <br /> separator and general arrangements of the facility. As required under this section,this facility <br /> diagram indicates the location and contents of each container. <br /> Discharee Prevention Measures- 112.7 (a)(3)(ii) <br /> See the following unloading and loading Sections of this Plan for a discussion of the discharge <br /> prevention measures implemented at the facility: <br /> • Loading and Unloading Connections- 112.7 (g)(4) <br /> • Tank Car Loading/Unloading Areas-40 CFR Part 112.7(h) <br /> • Secondary Containment for Loading/Unloading Areas- 112.7 (h)(1) <br /> Discharize/Drainaue Controls- 112.7(a)(3)(iii) <br /> See the following Sections of this Plan for a discussion of the discharge/drainage controls <br /> implemented at the facility: <br /> • Containment and Diversionary Structures-40 CFR Part 112.7(c)(1) <br /> • Facility Drainage-40 CFR 112.8(b) <br /> 15 May 2017 <br />