Laserfiche WebLink
Complaint Investigation Summary Report #: 5105 <br />COMPLAINT ID: C00051835 Site Location: NB 1-5 AT MATHEWS RD OFF RAMP <br />Activity Summary <br />Activity Date Recorded by <br />04/07/2020 8:10 am, called Lupe with Patriot Environmental, Lupe reported that they USA-ed MANZO <br />the area and covered the stained soil with plastic. Received emails from Lupe with <br />site disposition pictures attached. Reviewed the pictures, the area appears to be <br />adequately secured. Received a call back from the responsible party <br />representative Justin Del Mugnaio, discussed cleanup requirements and let him <br />know that I will be issuing a notice to abate (NTA). Justin provided the email <br />address to send the NTA to. <br />9 am, drafted a notice to abate for spill cleanup, converted to PDF and emailed to <br />jdelmugnaio@centraltransportcom, cc to 'Armendarez, Juan J@DOT' <br />luan.armendarez@dot.ca.gov> (property owner representative). Let Justin know <br />that EHD needs to be notified in advance of clean up and will need to verify that <br />clean up was adequate. <br />04/07/2020 Reviewed spill information from lead senior Elena Manzo via email. MURO <br />Revised complaint report 5104 due to an error in the location from Mathew Rd & <br />Endow Rd WB to the actual location which was North Bound 1-5 at Mathews Rd <br />Off Ramp. <br />04/07/2020 Received Cal OES Control #20-1917 Update from Lead Senior Elena Manzo <br />REHS for an approximately 80 gallons of diesel that spilled onto the roadway due <br />to a tractor trailer hitting a vehicle that was pulling a trailer. Originally, the OES <br />Spill Report had reported 100 gallons of diesel by Michelle Ruffin at CHP, <br />209-943-8600. <br />I filled out a pink short term complaint form and took to front desk so that they can <br />generate a complaint. <br />MURO <br />Received pin from Elena Manzo for the spill location. <br />04/08/2020 Completed Prop 65 MURO <br />04/08/2020 Made revisions to Prop 65 and Complaint Report 5104 to include the responsible MURO <br />party. <br />04/13/2020 Notified by Claudia Muro, EHS, that this spill clean-up is anticipated to be done on FLORIDO <br />4/15/20 when I am on C, and takes priority over another spill clean-up scheduled <br />for the same day, per Elena Manzo, Ld Sr REHS. Reviewed complaint narrative. <br />Requested Claudia to provide photos of the spill. Reviewed emails sent by Claudia <br />regarding the spill location. <br />04/13/2020 Downloaded and reviewed site pictures, started on site map and ER record MANZO <br />creation. <br />5105.rpt Page 2 of 6