My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
750
>
1600 - Food Program
>
PR0161533
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 7:17:05 PM
Creation date
10/15/2021 3:39:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0161533
PE
1632
FACILITY_ID
FA0001342
FACILITY_NAME
MUSD-LINCOLN SCHOOL
STREET_NUMBER
750
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22118001
CURRENT_STATUS
01
SITE_LOCATION
750 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2850
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DUCTLESS SPLIT SYSTEM <br />AC UNITS <br />Section 15865 <br />15-1207 <br />2.04 CONDENSATE DRAIN: <br />A. Provide type L hard drawn copper tubing with wrought copper solder joint fittings; no iron <br />to copper connections; copper fittings with IPS outlets and threaded brass nipples at <br />connections to fixtures and equipment; di -electric couplings or unions at connections to <br />dissimilar materials. Supply piping with temporary caps on all piping. <br />2.05 VIBRATION ISOLATOR: <br />A. Condensing units to be mounted on spring vibration isolator. Mason Type SSLFH or equal <br />with 1" deflection. <br />B. Spring Isolation manufacturer to provide structural calculations for anchorage of outdoor <br />condensing unit. Calculations to be stamped/signed by a California Licensed Structural <br />Engineer. Calculations to be submitted to DSA as a deferred approval process and <br />manufacturer to be responsible for addressing any/all DSA comments. <br />PART 3 - EXECUTION <br />3.01 TEST OF PIPING: <br />A. Test piping at completion of roughing in, in accordance with the following: <br />1. Pressurize with dry nitrogen to 300 psig and test all joints with an electronic <br />detector or halide torch. <br />2. Release the pressure and attach a high vacuum pump. Evacuate to 4,000 <br />microns and hold for 30 minutes. <br />3. Break vacuum with dry nitrogen and pressurize to 5 psig. Hold pressure in <br />system for 10 minutes. <br />4. Evacuate to 2,000 microns and hold for 30 minutes. <br />5. Use a mercury manometer or electronic vacuum gauge to measure pressures. <br />Do not start timing until recommended vacuum range is reached. <br />6. Show no loss in pressure or visible leaks after each test at the test pressures <br />indicated. Tests to be verified by Inspector of Record. <br />B. Testing equipment, materials, and labor shall be furnished by this Contractor. <br />C. Repair piping systems sections which fail required piping test, by disassembly and <br />reinstallation, using new materials to extent required to overcome leakage. Do not use <br />chemicals, stop -leak compounds, mastics, or other temporary repair methods. <br />3.02 INSTALLATION OF AC UNITS: <br />A. Install ductless split system air conditioners where indicated on drawings. <br />B. Install in accordance with equipment manufacturer's written instructions and with <br />recognized industry practices, to ensure that units comply with requirements and serve <br />intended purposes. <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.