Laserfiche WebLink
DUCTLESS SPLIT SYSTEM AC UNITS <br />Section 15865 <br />15-1207 <br />C. At the end of the piping pressure tests, if the system has been proved leak -free, charge <br />with refrigerant and fill the crankcase to the oil level specified by the manufacturer. All <br />refrigerant oil shall be delivered to the location in sealed containers. <br />D. Program unit thermostats as required by owner. <br />3.03 UNIT OPERATION TEST: <br />A. Upon completion of installation units, start up and operate equipment to demonstrate <br />capability and compliance with requirements. Field correct malfunctioning units, then <br />retest to demonstrate compliance. <br />B. Install units where indicated, in accordance with equipment manufacturer's written <br />instructions and with recognized industry practices, to ensure that units comply with <br />requirements and serve intended purposes. <br />END OF SECTION <br />0 <br />