My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
750
>
1600 - Food Program
>
PR0161533
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 7:17:05 PM
Creation date
10/15/2021 3:39:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0161533
PE
1632
FACILITY_ID
FA0001342
FACILITY_NAME
MUSD-LINCOLN SCHOOL
STREET_NUMBER
750
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22118001
CURRENT_STATUS
01
SITE_LOCATION
750 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2850
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ELECTRICAL WORK, GENERAL <br />REQUIREMENTS <br />Section 16000 <br />15-1207 <br />D. Cutting and Patching: <br />1. Do all cutting and patching, including structural reinforcing, necessary for the Work of this <br />Division. <br />2. Do no cutting or patching without prior approval. Repair damage done by cutting and <br />patching equal to original condition, in Architect's opinion. <br />E. Provide metal backing plates, anchor plates, and similar items that are required for anchorage <br />for the Work of this Section; securely weld or bolt to metal framing. Wood blocking or backing <br />will not be permitted in combination with metal framing. <br />F. Special forming, recesses, chases, and similar items, and wood blocking, backing, and grounds <br />necessary for the proper installation of Electrical Work will be provided as part of the Work of <br />other Sections. <br />G. Motor Connections: <br />1. Receive, uncrate and store equipment furnished as part of the Work of other Divisions, but <br />installed and connected as part of the Work of this Division. <br />2. Install individual magnetic and manual motor starters. <br />3. Provide motor power circuit complete, for all equipment furnished as part of the Work in <br />other Division as specified. <br />a. Provide all disconnect switches. <br />b. Line and low voltage temperature control and interlock wiring is provided as part of <br />the Work of Division 15, Mechanical. <br />H. Miscellaneous Equipment Connections: <br />Coordinate the exact method of making connections to equipment provided as part of the <br />Work of other Divisions and this Division. Provide additional labor, materials required for <br />complete connections. Determine exact stub -up locations and outlet heights from <br />equipment installers <br />3.3 TESTING AND ADJUSTING: <br />A. Furnish all labor and test equipment required for the Work of this Division. Testing work is <br />defined as that work necessary to establish that equipment has been properly assembled, <br />connected, and checked to verify that intent and purpose of Drawings, manufacturer's instruction <br />manuals, and directions of Architect have been accomplished in satisfactory manner. <br />B. Test each individual circuit at panel with equipment connected for proper operation. Verify <br />control circuit integrity: Field tests to verify component compliance with Specifications, adjusting, <br />calibrating, and setting circuit breakers, relays, timers, etc. <br />C. Ground tests shall meet requirements stated in Specification Section 260526. <br />D. Tighten nuts, bolts, lugs, connections, and similar items of switchboards, panels and motor <br />control centers to manufacturer's torque values. <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.