My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
750
>
1600 - Food Program
>
PR0161533
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 7:17:05 PM
Creation date
10/15/2021 3:39:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0161533
PE
1632
FACILITY_ID
FA0001342
FACILITY_NAME
MUSD-LINCOLN SCHOOL
STREET_NUMBER
750
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22118001
CURRENT_STATUS
01
SITE_LOCATION
750 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2850
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIRE ALARM SYSTEM <br />Section 16710 <br />15-1207 <br />termination. <br />B. Meetings shall be scheduled by the Contractor on a building by building basis and shall include <br />the Project Inspector, School's Representative, the electrical subcontractor, and the Fire Alarm <br />System subcontractor as a minimum. <br />3.03 TESTS <br />A. One-half to three-quarters of the way through project, District Facilities will set up a meeting <br />(preferably at the school site) with decision makers from Facilities, Police Services, <br />Maintenance, Maintenance Alarm Tech, General Contractor, Alarm Sub -contractor, and School <br />Administrator to review the alarm protocol and to identify responsible personnel and timelines <br />for the items listed in paragraph D, which follows. <br />B. After all equipment specified herein has been installed and is in operating condition, <br />performance tests shall be conducted by Contractor in accordance with, but not limited to, <br />Table 14.4.2.2, NFPA 72 to verify that installation and components comply with these <br />specifications. Contractor shall furnish competent personnel for these tests. Testing shall be <br />scheduled with the Owner and shall occur after receipt by Architect of Contractor's written <br />certification of completion, record one -line diagram, wiring diagrams, maintenance and <br />operation manuals, and other "As -Built" data required by these specifications. <br />C. Upon completion of the installation of the fire protective signaling equipment and after <br />satisfactory performance tests have been conducted, a satisfactory demonstration of the entire <br />system shall be made in the presence of the Project Inspector. Contractor shall coordinate with <br />Project Inspector and School. Demonstration shall be completed prior to occupancy by School <br />and prior to final testing with the Owner. <br />D. After system is completely tested, the Contractor shall take the following actions with the <br />Owner: <br />1. The Contractor will schedule a meeting with the Alarm Sub -contractors and Owner's <br />Representatives to determine alarm zone and device nomenclature. The Contractor shall <br />insure that the alarm zone and device nomenclature matches the actual building and room <br />numbers used by the school. Architectural numbering shall not be used. Once confirmed, <br />the Contractor shall demonstrate this to Owner's Representatives. <br />3.04 FIRE ALARM SYSTEM CERTIFICATION <br />A. Fire Alarm System Certification: Written certification on the form found in Figure 10.16.2.1.1, <br />NFPA 72 shall be submitted by the Contractor to Project Inspector stating for himself and the <br />equipment manufacturer that component parts are as L=ISTED AND APPROVED BY State Fire <br />Marshal, that the installation conforms in all respects to requirements as set forth in the <br />California Electrical Code, that acceptance testing has been performed in the presence of the <br />Project Inspector. Contractor shall complete and sign form and submit to Project Inspector. <br />END OF SECTION <br />n. <br />
The URL can be used to link to this page
Your browser does not support the video tag.