My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
750
>
1600 - Food Program
>
PR0161533
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 7:17:05 PM
Creation date
10/15/2021 3:39:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0161533
PE
1632
FACILITY_ID
FA0001342
FACILITY_NAME
MUSD-LINCOLN SCHOOL
STREET_NUMBER
750
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22118001
CURRENT_STATUS
01
SITE_LOCATION
750 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2850
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MULTI-PURPOSE SOUND SYSTEM <br />Section 16780 <br />15-1207 <br />B. Shall be the factory -authorized distributor for all of the major products provided and <br />fully empowered to the manufacturers to perform warranty repairs. <br />1.11 SUBSTITUTIONS <br />A. Any system changes and substitutions beyond any alternatives listed will be submitted <br />in writing to the owner for approval prior to the initiation of such change. <br />1.12 SUBMITTALS <br />A. Equipment cut sheets and other appropriate documentation will be submitted for <br />approval by the owner prior to the start of work. All drawings produced for this project <br />will utilize AutoCAD R15. Drawings will be available both in hard copy form and on <br />disk. <br />B. Progress Schedule: Include duration and milestones for the following. <br />1. All submittals specified <br />2. Completion of equipment buy out <br />3. Completion of equipment receipt at fabrication shop <br />4. Shop fabrication <br />5. Shop testing <br />6. Shipment to job site <br />7. Installation <br />8. Field testing <br />9. Training <br />10. First event date <br />C. Manufacturer's Product Data: <br />1. List of Materials: For each item, include. <br />a. Manufacturer <br />h Mnriel ni i mher <br />C. Quantity <br />2. Manufacturer's Product Data: In sequence of List of Materials, Data sheet for <br />each item, including all accessories, marked for proposed product. <br />D. Field and Shop Drawings: <br />1. Resubmit: for coordination reference complete with corrections from previous <br />submittal. <br />a. List of Materials <br />b. Manufacturer's Product Data <br />2. Field (Installation) Drawings: Collate in Sequence. <br />a. Drawing index/symbol sheet <br />b. Floor plans. At scale of Contract Documents. Show: <br />1) Devices with circuit number. <br />2) Rougi i=in. <br />3) Mounting height. <br />4) Conduit size. <br />5) Wire type, <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.