Laserfiche WebLink
Geotechnical Engineering and Geological Hazard Study <br />Lincoln Elementary School Modernization Project <br />Manteca, California <br />Page i i <br />7.2.: Engineered Fill Materials <br />Engineered fill used for the project should be either 1) select import engineered fill, or 2) general on-site <br />sandy soils with 'less than 3 percent organic content. <br />Select import engineered fall should be inorganic, have an R -value of at least 50, and plastic index less <br />than 4. In addition, select import engineered ill should meet the following particle -size gradation: <br />Sieve Opening Percent Passing, by Dry Weight <br />4 -inch square 100 <br />3/4 -inch square 70 minimum <br />U.S. No. 4 60 minimum <br />U.S. No. 200 40 maximum <br />Fill material that does not meet the above criteria should be tested under the direction of the Geotechnical <br />Engineer of Record to determine if it has engineering properties equivalent to, or better than, the existing <br />site materials. Samples of any proposed imported fill material should be submitted to the Laboratory of <br />Record for testing and approved by the Geotechnical Engineer of Record prior to being brought to the <br />site. <br />General on-site engineered fill should be inorganic, contain no rocks greater than 4 -inches in least <br />dimension, and be free of deleterious materials. Soils containing more than 3 percent by weight of organic <br />material should be considered organic. Our subsurface data and laboratory test data indicate that the near - <br />surface soil encountered in the borings generally meets the criteria for on-site engineered fill. However, <br />the deeper soils are also classified as clay or silt containing more than 50 percent passing the No. 200 <br />sieve and should not be placed in the upper 2 feet of subgrade. <br />7.2.5 Engineered Fill Placement <br />Engineered fill should be placed in a series of horizontal layers not exceeding 8 inches in loose thickness, <br />uniformly moisture -conditioned, and compacted to achieve a minimum relative compaction of 90 percent <br />of the ASTM D1557 maximum dry density. Non -expansive fill soils and native silts and sands should be <br />uniformly moisture conditioned to between I and 3 percentage points above the optimum moisture <br />content. Fill soils composed of clays (such as deep utility backfill) should be uniformly moisture <br />conditioned to between 3 and 5 percentage points above the optimum moisture content. Additional fill <br />Iifts should not be placed if the previous lift did not meet the required relative compaction or if soil <br />conditions are not stable. Discing, tilling, and/or blending may be required to uniformly moisture - <br />condition soils used for engineered fill. The upper 12 inches of pavement subgrades should be compacted <br />to at least 95 percent relative compaction by the CAL 216 test procedure. <br />7.2.6 Excavations <br />Excavations will typically encounter compacted engineered fill and unconsolidated silts and sands. These <br />materials can be easily excavated with conventional earthmoving equipment. We anticipate that <br />temporary excavations less than 5 feet deep and above groundwater may be cut as steep as 1''/2H: IV <br />(horizontal to vertical). Deeper cuts should be considered on a case-by-case basis. All open cuts should be <br />in compliance with applicable Occupational Safety Health Administration (OSHA) regulations <br />(California Construction Safety Orders, Title 8) and should be monitored for evidence of incipient <br />instability. The final inclination of both permanent cut and permanent fill slopes above the groundwater <br />level should be made no steeper than 2H:1 V. <br />N9 <br />