My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
750
>
1600 - Food Program
>
PR0161533
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 7:17:05 PM
Creation date
10/15/2021 3:39:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0161533
PE
1632
FACILITY_ID
FA0001342
FACILITY_NAME
MUSD-LINCOLN SCHOOL
STREET_NUMBER
750
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22118001
CURRENT_STATUS
01
SITE_LOCATION
750 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2850
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Commissioning Plan, June 24, 2015 <br />■ EF -2G, 475 cfm exhaust fan <br />■ EF -3G, 325 cfm exhaust fan <br />■ EF -4G, 1,000 cfm exhaust fan <br />■ MAU-1G, 1,000 cfm make-up air unit with gas heating and evaporative cooling <br />Functions to be tested <br />■ All Systems: <br />■ ACs: <br />All Acceptance Tests as required by the California Energy Code <br />Air balancing by an independent AABC or NEBB certified air balancing <br />firm. <br />Cooling mode <br />Heating mode (1st and 2nd stage) <br />Economizer mode <br />• Demand controlled ventilation (DCV) mode <br />■ EFs: Operation per control scheme (switch, timer, interlock, etc.) <br />■ MAU: Operation per control scheme (switch, timer, interlock, etc.) <br />o Conditions of tests: <br />■ HVAC systems shall be completely installed and fully operational prior to <br />Functional Testing. <br />• Building envelope shall be sealed and insulated. <br />o Criteria for acceptable performance <br />■ All systems: <br />• All acceptance tests and associated forms completed with no issues <br />noted. <br />• Air testing and balancing (TAB) report completed with no issues noted. <br />• All modes function per design, including cooling, heating, economizer, <br />DCV, switches, timers, and interlocks as applicable. <br />o Indoor Lighting System and Controls <br />o Original design intent: <br />■ Lighting energy will be minimized without compromising required light levels by <br />the use of: <br />• LED technology <br />• Lighting Control Panel (LCP) <br />• Occupancy sensors <br />• Daylighting controls <br />• Skylights <br />o Equipment and systems to be tested: <br />■ Light levels <br />■ LCP functionality (sweep on, sweep off, etc.) <br />■ Occupancy sensors <br />■ Daylighting controls <br />o Functions to be tested <br />• Light levels <br />■ LCP functionality <br />■ Occupancy sensors functionality <br />■ Daylighting controls functionality <br />o Conditions of tests: <br />■ Lighting systems shall be completely installed and fully operational prior to <br />Functional Testing. <br />■ Areas affected by interior lighting systems must be finished including floor, wall <br />and ceiling finishes <br />2of8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.