My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
750
>
1600 - Food Program
>
PR0161533
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 7:17:05 PM
Creation date
10/15/2021 3:39:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0161533
PE
1632
FACILITY_ID
FA0001342
FACILITY_NAME
MUSD-LINCOLN SCHOOL
STREET_NUMBER
750
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22118001
CURRENT_STATUS
01
SITE_LOCATION
750 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2850
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Commissioning Plan, June 24, 2018 <br />■ All fenestration must be completely installed with all labels, protective films, etc. <br />removed and transparent surfaces cleaned. <br />o Criteria for acceptable performance <br />■ Light levels at or above required levels when spaces are occupied <br />■ LCP functions per design <br />■ Occupancy sensors turn lights on/off per design <br />■ Daylighting controls dim or turn lights on/off per design without compromising <br />required light levels <br />o Water Heating System <br />o Original design intent: An electric water heater and circulation pump will serve the <br />bathrooms and a gas water heater and circulation pump will serve the kitchen. Hot <br />water temperatures are designed to range between 105°F and 120°F. <br />o Equipment and systems to be tested: <br />■ EWH-1, Electric Water Heater serving bathrooms <br />■ DWH-1, Gas Water Heater serving kitchen <br />■ CP -1, Domestic Hot Water Circulation Pump <br />■ CP -2, Domestic Hot Water Circulation Pump <br />o Functions to be tested <br />■ Hot water temperature <br />■ Circulation pump timers <br />o Conditions of tests: <br />Water heaters, circulation pumps, timers/controls, and all fixtures requiring <br />hot water must be completely installed with drains and hot water supply fully <br />operational. <br />o Criteria for acceptable performance <br />■ Hot water temperature at all outlets within acceptable temperature range. <br />■ Circulation pump timer functioning per design. <br />o Renewable Energy Systems: Not included in project. <br />o Landscape Irrigation System: <br />■ Original design intent: All new landscape irrigation installed as part of this project will <br />be via drip irrigation with irrigation controls incorporating either weather -based or soil <br />moisture -based sensors. <br />o Equipment and systems to be tested: <br />■ Drip irrigation controller/timer <br />o Functions to be tested <br />■ Need -based irrigation based on weather -based or soil moisture -based <br />sensors. <br />o Conditions of tests.- <br />Landscaping <br />ests: <br />Landscaping and landscape irrigation system must be completely installed <br />and irrigation system must be fully operational. <br />o Criteria for acceptable performance: System will provide Irrigation only when needed <br />per sensors. <br />Water Reuse Systems: Not included in project. <br />All Systems: <br />o Site Observation: The Commissioning Provider will make periodic visits to witness <br />installation of equipment and systems. All visits will be planned in advance, will have <br />a specific agenda and will be coordinated with the general contractor. The general <br />contractor will keep the Commissioning Provider apprised of any field changes which <br />may affect commissioned equipment or the commissioning schedule. <br />o Prior to start-up, installing contractor must verify installation to general contractor in <br />writing. General contractor to provide a copy of written verification to Commissioning <br />Provider. <br />3 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.