Laserfiche WebLink
Commissioning Plan, June 24, 2015 <br />4.0 Commissionina Team Information <br />Function <br />Name/address <br />Contact Info <br />Owner <br />1 Susan Bel` <br />Manteca Unified School District <br />; 209-858-0765 <br />Anthony Herrera <br />Project Manager <br />1 g <br />Rainforth Grau Architects <br />916-368-7990 <br />2407 J Street, Suite 202 <br />Sacramento, CA 95816 <br />Steve Wisniewski <br />Commissioning Provider <br />Optimized Energy & Facilities Consulting <br />916-626-5518 <br />5734 Lonetree Blvd <br />Rocklin, CA 95765 <br />Tim Dewitt <br />Architect <br />Rainforth Grau Architects <br />916-368-7990 <br />2407 J Street, Suite 202 <br />Sacramento, CA 95816 <br />David Weston <br />Engineer <br />Mechanical En g <br />Weston & Associates <br />{ 4700 1 Anne Way <br />1 916-482-0820 1 <br />Carmichael, CA 95608 <br />Dean Yomogida <br />Electrical Engineer <br />EDGE Electrical Consulting <br />916-256-2460 <br />431 30th Street <br />Sacramento, CA 95816 <br />Jacob bodge <br />General Contractor <br />C.T. Brayton & Sons, Inc. <br />209-838-7388 <br />P.O. Box 95 / 1804 Jackson Ave. <br />Escalon, CA 95320 <br />Maintenance Manager <br />Susan Bell <br />Manteca Unified School District <br />209-858-0765 <br />5.0 Commissioning Process activities, Schedules, and Responsibilities <br />• General Roles and Responsibilities <br />o Commissioning Provider: Coordinates the commissioning process, writes and /or reviews <br />Functional Testing plans, directs and documents Functional Testing. <br />c Project Manager: Facilitates and supports commissioning process and gives final approval of <br />the commissioning work. <br />o Maintenance Manager: Coordinates maintenance staff participation in the commissioning <br />process. <br />o General Contractor: Facilitates the commissioning process, ensures that subcontractors <br />perform their responsibilities and integrates commissioning into the construction process and <br />schedule. <br />o Subcontractors: Demonstrate proper system performance. <br />o Maintenance Staff: Participate in the commissioning tasks and performance testing, review <br />O&M documentation, and attend training. <br />o Architects and Engineers: Perform construction observation, approve O&M manuals and <br />assist in resolving any issues. <br />o Testing and Balancing Agency: Submit proposed TAB procedure, project agenda, and final <br />report, perform TAB verification, and participate in O&M personnel training. <br />o Manufacturers: Equipment manufacturers and vendors provide documentation to facilitate the <br />commissioning work and (when contracted to do so) perform startup. <br />5of8 <br />