Laserfiche WebLink
SUBMITTALS <br />Section 01300 <br />15-1207 <br />included contains all of the necessary Contract information. It is the Contractor's <br />responsibility to make any changes or revisions to the electronic data files as necessary. <br />F. Architect may, at his complete discretion and without explanation, approve or deny any and all <br />requests for electronic data. <br />2.09 DEFERRED APPROVAL <br />A. Certain specified products require the specified manufacturer to design the product or system <br />after the Owner -Contractor agreement has been signed. Because the selection of the <br />manufacturer of these products resides with the Contractor, it is not possible to anticipate the <br />actual product or system which will be supplied for the Project prior to bidding. However, <br />since no Contract can be executed between the Owner and the Contractor without prior <br />approval of the Contract Documents by DSA, "Deferred Approval" of these products must be <br />obtained after the contract is executed. This requires complete design documents and <br />calculations be submitted by the Contractor to DSA through the Architect and the Architect's <br />consultants. The manufacturer and Contractor are responsible for prompt submission of <br />these Deferred Approval submittals to the Architect, and for making any changes required by <br />DSA, at no cost to the Owner, and prior to incorporation of the product or system into the <br />work. The items requiring "Deferred Approval" are noted on the Cover Sheet of the drawings. <br />B. Submit to the Architect for processing all items identified as Deferred Approval on the <br />drawings or within the specifications. Approval of these items is contingent upon approval of <br />the submittal by DSA. <br />C. Submit Deferred Approval submittals as outlined for Shop Drawings above and as described <br />herein. <br />D. Submit complete drawings, details, specifications, calculations and other information <br />necessary to fully describe and substantiate the submittal, signed and stamped by a <br />Structural Engineer licensed in the State of California. <br />E. Deferred Approval items will be checked for general design concept conformance only and <br />will be submitted to the Division of the State Architect for review. If necessary, submittals will <br />be returned to the Contractor for corrections and/or additional information, as required by <br />DSA. The Contractor shall make necessary changes and resubmit for additional review. <br />F. The Architect and Engineer will review the submittal one time only and will not perform <br />extensive calculations nor prepare drawings required for DSA. If the Contractor fails to <br />provide proper information for approval or the Architect or Engineer is required to perform <br />additional duties, such services will be reimbursed by the Owner and back -charged to the <br />Contractor. <br />G. Do not proceed with fabrication until deferred approval documents have been approved by <br />DSA. <br />2.10 CERTIFICATIONS <br />A. Where specifically indicated by pertinent Specification Sections, submit proper certification of <br />recognized producer or association in lieu of or in addition to testing. Certification shall attest <br />to product's compliance with requirements of Contract Documents. <br />B. Certifications for this project shall also include: <br />1. Fire Alarm System Certification: <br />9 <br />